My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Puget Sound Energy 1/10/2017
>
Contracts
>
Agreement
>
Grant
>
Puget Sound Energy 1/10/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2017 10:55:06 AM
Creation date
8/4/2017 10:55:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Puget Sound Energy
Approval Date
1/10/2017
Council Approval Date
12/14/2016
Department
Facilities
Department Project Manager
Jeff Harris
Subject / Project Title
Everett Performing Arts Center Grant Rebate
Tracking Number
0000807
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Grant
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PSE PUGET SOUND ENERGY Conservation Schedule G250 <br /> Agreement No.: C-16376 <br /> Project No.: 093-5434 <br /> ATTACHMENT C <br /> TO CONSERVATION GRANT <br /> Conservation Measure(s)shall be verified as follows prior to Grant payment: <br /> A. Contractor shall verify proper installation and operation of the DDC controls to ensure <br /> that control device and components are calibrated, adjusted and operate in accordance <br /> with approved sequences of operation. <br /> B. Trends must be provided to PSE both in raw data and graphic form with appropriate <br /> points to demonstrate proper operation of all HVAC sequences. <br /> C. Trended data for the multipurpose room and the auditorium: Discharge air temp and set <br /> point, space temp and setpoint, mixed air temp, return air sensor temp, % outside air, <br /> outside air temp, CO2 ppm and set point; duct static pressure and set point <br /> D. Contractor shall provide completed commissioning documentation showing systems <br /> passed and are operating per design. <br /> If intended energy savings are not being achieved by Conservation Measure(s) because specified equipment efficiency <br /> parameters or performance parameters defined above are not used, Participant shall be required to correct such deficiencies <br /> prior to Grant payment. Failure to comply with specified equipment efficiency or performance parameters may result in <br /> forfeiture or reduction of Grant payment. <br /> 60114/13 Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.