Laserfiche WebLink
L <br /> AFIN-PCO J INC. t <br /> p O4m 02/02/2017 <br /> TITLEVERTICAL LADDER INSTALLATION PACGE uNIT: 4X12 INDUCED DRAFT COOLER/CONDENSER DWG.# LDAW630412-DB <br /> KA <br /> 1 -7 - -J <br /> (� p <br /> O <br /> O O = o 0 <br /> 0 <br /> 72 4 <br /> Ao <br /> 1l <br /> 0 O <br /> [ 18291 [ 1219 1 244 ►� <br /> 11--113/4" 4'-i/2" <br /> [ <br /> 36501 1123 ] <br /> 'THE BOTTOM OF THE LADDER IS AT THE BASE OF THE UNIT. SIDE VIEW END VIEW <br /> IF THE UNIT IS ELEVATED THEN A LADDER EXTENSION SHOULD <br /> BE CONSIDERED.(CONSULT FACTORY). <br /> LADDER EXTENSIONS OF UP TO 3 FEET CAN BE ADDED WITHOUT <br /> ANY ADDITIONAL SUPPORT.FOR A LADDER EXTENSION LONGER <br /> THAN 3 FEET ADDITIONAL SUPPORT MUST BE PROVIDED BY OTHERS. <br /> NOTES: <br /> 1. THE VERTICAL LADDER IS AN INDUSTRIAL GRADE. UNIT <br /> 2. THE LADDER SHIPS LOOSE FOR FEILD INSTALLATION BY OTHERS. <br /> 3. SEE MOUNTING ARRANGEMENT DETAILS AS SHOWN. <br /> 4. THE LADDER AND DESIGNS FALL UNDER OSHA REQUIREMENTS. LADDER SUPT. LADDER BRKT. <br /> REMOVE THESE BOLTS 3/8"0 HARDWARE <br /> TO DISASSEMBLE FOR LADDER SUPPLIED BY FACTORY <br /> SHIPMENT <br />