Laserfiche WebLink
I - <br /> INSPECTION REPORT <br /> � Date 1/3(I( q Permit: v f v6 ! D S k <br /> Contractor: cj , <br /> CX Owner: r7ZJE- K <br /> Site Address: �UO 3 W Cis/lam LAO-ES <br /> TYPE OF INSPECTION REQUESTED c 6 <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> piii.:... ••'n. ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> 4111_ <br /> •Ceiling : d ❑Drywall Nailing ❑Plumbing Final <br /> n lectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> iii .. • . .rains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final / _❑HWT✓jFinal <br /> OTHER OR CONSULTATION: (O$— - 30-33 <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL T- - <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: WO <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspect° • Date: 7/3// <br /> EIR(10/06) DATABAR.INC. <br />