Laserfiche WebLink
415-18 AIRPORT TERMINAL BUILDINGS,FUELING RAMP DRAINAGE,AND LOADING WALKWAYS <br /> Index <br /> Copyright©2007 National Fire Protection Association.All Rights Reserved. <br /> The copyright in this index is separate and distinct from the copyright in the document that it indexes.The licensing provisions set forth for the <br /> document are not applicable to this index.This index may not be reproduced in whole or in part by any means without the express written <br /> permission of NFPA. <br /> A Aircraft loading walkways ...........................................6.1 <br /> Air-conditioning equipment.........................4.2.1,4.2.2,A.4.2.2 Fire tests ...................see Fire tests,aircraft loading walkways <br /> Aircraft fueling facilities .......................................4.1.3,C.1 Interior finish ................................6.2.1 to 6.2.3,A.6.2.1 <br /> Aircraft fueling ramps Materials ..........................................................6.3 <br /> Definition ..........................................................3.3.1 Airport terminal buildings <br /> Design.........................................................4.1.3,CA Belowgrade areas...............................................4.1.4 <br /> Drainage ........................................................Chap.5 Interior finish materials ..............................4.1.2,A.4.1.2 <br /> ................ . <br /> Inlets ...........................5.1.1 to 5.1.3,A.5.1.1,A.5.1.2,C.1 Types of construction allowed .....................4.1.1,Annex B <br /> Maintenance.............................................5.2,A.5.2.1 Coveredplane-loading positions 4.5.1.6 <br /> Slope ...................................................5.1.1,A.5.1.1 <br /> Curtains ......................................................6.2.8,A.6.2.8 <br /> Trenches .........................5.1.2,5.1.7,A.5.1.2,A.5.1.7,C.1 Cab and rotunda slat 6.2.9,6.4.8,A.6.2.8 <br /> Aircraft loadingwalkways wa ys ........................................Chap.6 Fire,automatic...............................................6.2.9.1(4) <br /> Basicdesign ..........................................................6.1 <br /> Definition ..........................................................3.3.2 <br /> Emergency lights.................................................6.2.10 -D- <br /> Fire protection ......................6.1.2(2),6.2.9.1(5),6.5,A.6.5.1 Definitions ........................................................Chap.3 <br /> .......................................... <br /> Fire tests ......................see Fire tests,aircraft loading walkways Design requirements see Construction <br /> Materials .............................................................6.3 Detection systems.........................................4.1.5.3.1.3,C.1 <br /> Requirements..................................6.2,A.6.2.1 to A.6.2.11 Doors ..........................................................see also Exits <br /> Slope....................................................6.2.11,A.6.2.11 <br /> Airport drainage system Aircraft loading walkways..................................6.2.4,6.2.7 <br /> Building drainage systems........................................5.1.4 Drainage <br /> Containment facility .....................5.1.5 Aircraft fueling ramps......................seeAircraft fueling ramps <br /> Flushing .....................................................5.1.6,5.2.2 Airport.....................................seeAirport drainage system <br /> Maintenance................................................5.2,A.5.2.1 <br /> Separators............................................5.1.5,5.2,A.5.2.1 -E- <br /> Airport ramps .............................see also Aircraft fueling ramps Electrical installations.............................................. <br /> ....4.4Defnition ..........................................................3.3.3 <br /> Electrical service rooms located near ...........................4.4.2 Emergencyhghts aircraft loading walkways .....................6.2.10 <br /> .......4.2.6 <br /> Exhaust hoods ........................................................Exits onto ..l buildings <br /> ...................................4.3.2, hap.4 Exhaust openings ............4.2.2,A.4.2.2 <br /> Airport terminal buildings .......................................Chap.4 P � ............................... <br /> Construction ..........................................see Construction Exits.......................................................4.3,A.4.3.2,C.1 <br /> Definition.................................................3.3.4,A.3.3.4 Exposure Fire <br /> Electrical installations...............................................4.4 Aircraft loading walkways ...............................6.1.1,A.6.1.1 <br /> Exits ....................................................4.3,A.4.3.2,C.1 Building sprinklers operating from .........................A.4.5.1.5 <br /> Fire protection ...............................4.1.5.3,4.5,A.4.5.1,C.1 Minimizing damage from ..........................................C.1 <br /> Heating,ventilating,and air conditioning Extinguishers,portable fire .........................................4.5.6 <br /> (HVAC)systems ................................4.2,A.4.2.2 <br /> Air pressure,aircraft loading walkways ...6.2.5,6.2.6,A.6.2.5,A.6.2.6 F <br /> Air supply intake openings .................................4.2.2,A.4.2.2 <br /> Alarm systems,fire 4.5.2,A.4.5.2.2 Fire curtains,automatic........................................6.2.9.1(4) <br /> Annunciation at front entrance ........................4.5.2.2,A.4.5.2.2 Fire hydrants ..........................4.5.3,4.5.5.2,A.4.5.5.2,A.4.5.5.3 <br /> Application of standard................................................1.3 Fire protection systems <br /> Approved(definition) ......................................3.2.1,A-3.2.1 Aircraft loading walkways ..........6.1.2(2),6.2.9.1(5),6.5,A.6.5.1 <br /> Authority having jurisdiction(definition) ................3.2.2,A.3.2.2 Airport terminal buildings ..................4.1.5.3,4.5,A.4.5.1,C.1 <br /> Covered plane-loading positions ..............................4.5.1.6 <br /> Firepumps .......................................................A.4.5.5.3 <br /> Fire shutters,automatic ...........................................4.1.5.3 <br /> Belowgrade construction ............................................4.1.4 Fire tests,aircraft loading walkways ..................................6.4 <br /> Boilers.................................................................4.2.4 Bumpers ....................... 6.4.9,A.6.4.9.1 <br /> ......................... <br /> Bumpers,tests of .........................................6.4.9,A.6.4.9.1 Cab and rotunda slat curtains....................................6.4.8 <br /> Flexible closures...................................................6.4.7 <br /> -C- Floors...............................................6.4.3.1,6.4.4,6.4.6 <br /> Cabs,aircraft loading walkway Furnace temperature .............................................6.4.3 <br /> Slatcurtains.................................................6.2.9,6.4.8 Scope of............................................................6.4.1 <br /> Windows in ........................................................6.2.4 Seals,miscellaneous .............................................6.4.10 <br /> Canopies,aircraft loading positions.......................4.5.1.6,6.2.8 Specimens,test.........................................6.4.5,A.6.4.5.3 <br /> Chimneys/stacks .....................................................4.2.4 Temperatures of unexposed surfaces ...........................6.4.4 <br /> Coal-fired equipment,location of.........................4.2.3,A.4.2.3 Time-temperature curve to be used .............................6.4.2 <br /> Communications systems ................................4.5.2,A.4.5.2.2 Walls ................................................6.4.3.1,6.4.4,6.4.6 <br /> Construction Weather-stripping assemblies ...................................6.4.10 <br /> Aircraft fueling facilities.....................................4.1.3,C.1 Flammable vapor releases................see Vapor releases,flammable <br /> 2008 Edition <br />