Laserfiche WebLink
PPPP- <br /> INSPECTION REPORT <br /> Date: 2� Permit: <br /> Contractor: i'ower 'C9✓►'I <br /> Owner: C I l t55�-� <br /> Site Address: 5 5 6 1 CG l b�f <br /> TYPE OF INSPECTION REQUESTED <br /> ,/ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> uit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> L$ettgh I ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> e ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Insulation ❑Mechanical Final ❑ Medical Gas <br /> id ❑Drywall Nailing ❑ Plumbing Final <br /> ectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHE CONSULTATION: <br /> [5-P RO ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> R T.C.O. ❑ CORRECTION REQUESTED <br /> E] OK FOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> r <br /> Inspects Date: <br /> r-Ir, 11'r)(', �j/[=.'NATt2 OHMS A' ('..,..-•,'!i/41N1-tlY110 <br />