Laserfiche WebLink
S Al1_z n I A ' tAk I KANSPOK IA I ION IMPROVLM ENT PFOGRAM 19 84 TO 19 89 <br /> — OBLIGATION PROGRAM - Hearing pate JUNE 21,28,4 29,1983 <br /> CITY OF EVERETT, PAGE 2 of 6 Adoption Date <br /> City/County JCeypunching Note: Data entered in cols 1-8 must Resolution Number <br /> City No. 0 4, 21 d 3-6 be on all cards punched from <br /> County Nn, I 3 17-8 fhi3 form, <br /> 2 X PROJECT CO5T5 1N THOUSANDS OF DOLLARS <br /> c , <br /> • PROJECT IDENTIFICATION h a . OBLIGATION SCHEDULE <br /> 2 Title,Route,Road LogNo., oY Total d FUNDING SOURCE <br /> Section No., -o Work g a h -- YEAR <br /> E Location Termini,Deecription of Work L'3 Len th FEDERAL TOTAL <br /> v Beginning Milepo5f 4 bridge No. .�a Code (Mi19s) 13t 2 nd 3 rd 4,5 U.A.B. LOCAL FUNDS <br /> "" u L u: : : 2 ci tg E ement) ro th AMOUNT PROGRAM <br /> N . <br /> asp 3C .55 17 . <br /> gst 5Z_ IMENICIENIMINI D6 <br /> • <br /> WALNUT - MAPL, EEVERETT - PACFC ) 37 4a4 11111311 <br /> U 3 60 60 <br /> III <br /> Evaluate alignment & design alternatives for a North- <br /> South arterial on the west side of I-5 between Ever- <br /> ett SR 2 W off, Hewitt $ Pacific FAM #2797 <br /> 2 CASINO RD 7 7 0 0 - 7 8 0 0 / ABF 015111115011111111111111111111111 1 5 0 <br /> Reconstruct corder providing increased design and <br /> superelevation FAM #2796 <br /> 3 LOMBARD RR BRIDGE Pill O 1 0 1111111111111111111LEMEMMINIMEMMEINIMEMMI <br /> Determine needed repairs to remove load limit imposed <br /> due to structural deformations. Funding and priority <br /> to be determined. FAM #2737 <br /> 4 u : 1 • k P • : : 1 S e t - P : 1 111 : 1 . IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 2 0 0 <br /> Provide "interim" (10-15 year) improvements to the J K N III <br /> "Haul Road" between Hardeson and the Upper Ridge/re- <br /> • -• ••- Cs. - • , - - ' •• :u # • <br /> IIMMUMMIIIIMINIMMETRIMMIIIIMMIMIWAMIMINIIIIIMENRIMIIIIINOMIIIMULNIIIIIIIIIIIMINIIIIMMIIIIIIIIIIIMEIMMILMIIIIIIIIMIIMIEM <br /> Design arterial improvements including widening, side <br /> walks, lighting, channelization, bikeway signalizatio <br /> aid so -stial I-5 ramps(SB on 8 NB off) FAM #2588 <br /> 6 1 1 2 ST SB ON NB OFF I 5 R . M P. 0 2 5 1111.1 5011111111111111111 4 111111 5 0 <br /> Design report and EIS on the construction of a NB off <br /> and SB on ramp to I-5 at 112th FAM #2588 ill <br /> 7 - L A R I M R 4 1 - C L ©%AIMINI 2 1 0 ©fUME1111111.11111.1.1111 1 0 0WEIMIIMMINIMMIE 1 0 1 1 0 0 <br /> Design reconstruction widening road with shoulders, <br /> bikeway, drainage and traffic control. FAM #2609 III <br /> MI"' 1101111111111111111MMIMMIIMMIIIIIIIIIIIIIMMIIIIIIIIIIIIIIIIIIIMMINM <br /> DtSTRI BUTT ON <br /> I COPY DISTRICT STATE AID ENGINEER <br /> DOT 140-049 I rnov r.o A n 1t tt.-et /An ar vl <br />