My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2263
>
Resolutions
>
Resolution 2263
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2017 11:57:34 AM
Creation date
8/10/2017 11:57:34 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
2263
Date
4/20/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION NO. <br /> A RESOLUTION accepting the Northeast <br /> Everett neighborhoods recommendations <br /> for expenditures of approximately $60,120 <br /> of 1983 Community Block Grant funds; <br /> specifying the improvements to be <br /> made; and authorizing the preparation <br /> of a Plans and Systems Ordinance for <br /> construction and project implementation <br /> in June, 1983. <br /> WHEREAS, the City Council has recognized the need to improve public <br /> facilities in the Northeast Everett Neighborhood; and <br /> WHEREAS, numerous neighborhood meetings have been held to discuss <br /> project proposals; and <br /> WHEREAS, on March 15 and 16, 1983, residents of the Northeast Everett <br /> neighborhood held a neighborhood-wide meeting at which residents voted on <br /> proposed projects; <br /> NOW THEREFORE, be it resolved by the City Council of the City of Everett <br /> that: <br /> 1. The following projects will be implemented or constructed with the funds <br /> available through the 1983 Community Development Block Grant Program as <br /> recommended by Northeast Everett residents. (The project which received <br /> the greatest number of votes is listed as A, the Project which received the <br /> next greatest number of votes is listed as B.) <br /> A. State Street - 18th Street to 19th Street - Construct curbs, gutters, and <br /> sidewalk on East and West side and provide storm drainage and overlay <br /> existing roadbed. (estimated project cost: $60,000.) <br /> B. Maple Street - 10th Street to 11th Street - Construct curbs, gutters, <br /> sidewalks, street wideningand overlay, storm drainage, and landscaping. <br /> (estimated project cost: $60,000.) <br /> 2. The Mayor be instructed to have a Plans and Systems Ordinance prepared and <br /> presented to the City Council which will officially authorize and fund the <br /> development of contract plans, specifications and detailed cost estimates and <br /> the future construction of the above improvements. <br /> 3. Should costs be less for the above projects than originally estimated, projects <br /> receiving the next highest neighborhood priority shall be included for funding. <br /> If project costs exceed the estimates given, the lowest pr'ority project will be <br /> dropped or revised, to cost within th s availabl- <br /> d <br /> Cor i an ' tr:. i'g Resolution <br /> Passed and approved this Q 7 day of /9 .4.? , 1983. <br /> %1 i or <br /> Coun President <br />
The URL can be used to link to this page
Your browser does not support the video tag.