Laserfiche WebLink
BUILDING CODE 6. PROVIDE 3"x3"x0.229" WASHERS AT ALL <br /> 2009 INTERNATIONAL BUILDING CODE ANCHOR BOLTS. SHEARWALL SCHEDULE (CDX) <br /> FLOOR LOAD 7. BOLT HOLES SHALL BE NOMINAL DIAMETER MARK SHEATHING EDGE NAILING FIELD NAILING SILL PLATE & BOTTOM/TOP PLATE <br /> DEAD LOAD : 12 psf OF BOLT PLUS 1 16" UNLESS NOTED CONN. A " <br /> p # CONN. � FND <br /> LIVE LOAD: 40 psf OTHERWISE. LAG BOLT PILOT HOLES SHALL c e4 <br /> BE PRE-DRILLED TO 60% OF THE NOMINAL 1 3/a" CDX ONE A.B. ® 48" f N$ <br /> Q 8d ® 6" 0/C 8d @ 12" 0/C 0 C W 2x SILL LTP4 20" 0/C W/ <br /> ROOF LOAD DIAMETER OF THE LAG BOLT UNLESS NOTED FACE / PLATE <br /> 2x BOTTOM PLATE <br /> DEAD LOAD: 15 psf OTHERWISE. 10d ® 4" 10d ® 12" 5/$" 0 A.B. ® 14" (n <br /> FLAT ROOF SNOW LOAD: 25 psf 0 1%2" CDX EACH <br /> SNOW EXPOSURE FACTOR (Ce): 1.1 8. ALL SILL PLATES SHALL BE BOLTED TO 6 FACE 0/FACECH 0/FACECH 0/C PLATE SILL LTP4 O�TTOMOPLA E/ � <br /> SNOW LOAD IMPORTANCE FACTOR (is): 1.0 THE FOUNDATION WITH 5#8" MINIMUM s „ D a <br /> DIAMETER BOLTS SPACED AT A MAXIMUM OF � 2" CDX EACH 10d @ 3' 1 O 0 12" /8 0 A.B. @ 12" <br /> THERMAL FACTOR (Ct): 1.1 48" ON CENTER. BOLTS MUST BE EMBEDDED FACE /C EACH 0/C W/ 3x SILL LTP4 BOTTOM <br /> 0/C W/ U L <br /> 0/C EACH 0 3x BOTTOM PLATE c� <br /> FACE FACE PLATE O <br /> WIND DESIGN DATA A MINIMUM OF 7" INTO CONCRETE OR L <br /> MASONRY, SEE PLANS AND DETAILS FOR Cf) >r," <br /> 1. BASIC WIND SPEED: 85 MPH SPECIFIC REQUIREMENTS WHERE APPLICABLE. SHEARWALL NOTES < a I" <br /> 2. WIND IMPORTANCE FACTOR (Iw): 1.0 1. ALL STUDS, BLOCKING, TOP AND BOTTOM PLATES SHALL BE HEM-FIR NO. 2 UNLESS NOTED �M Q o <br /> BUILDING CATEGORY: II OTHERWISE ON PLANS. ALL SHEATHING EDGES MUST BE BACKED WITH 2x OR WIDER FRAMING J E3 -` N <br /> 3. WIND EXPOSURE: 9. RIM JOIST IS TO BE 11#4" LSL MINIMUM. rn <br /> 4. Kzt = 2.0 (SEE NOTE #3). or) w 00 <br /> 5. INTERNAL PRESSURE COEFFICIENT: NA 10. PROVIDE DOUBLE JOIST UNDER ALL W i <br /> 6. APPLICABLE WIND PRESSURE FOR PARALLEL PARTITION WALLS AND SOLID 2. SHEATHING MAY BE INSTALLED EITHER HORIZONTALLY OR VERTICALLY. ALL SHEARWALL Q M <br /> COMPONENTS AND CLADDING: NA BLOCKING UNDER PERPENDICULAR PARTITION SHEATHING MUST EXTEND TO THE OUTISDE EDGE OF ALL HOLDOWN POSTS AND CORNERS, AND O N <br /> WALLS. TO THE INSIDE EDGE OF FRAMING AROUND OPENINGS. 3 <br /> SESIMIC DESIGN DATA - o , 3 <br /> 1. SEISMIC IMPORTANCE FACTOR: 1.0 11. CONTACT THIS OFFICE PRIOR TO MAKING 3. WHERE SHEATHING NAILING IS SHEARWALL #3 AND GREATER, ALL FRAMING MEMBERS D 00 > <br /> Lri <br /> SEISMIC USE GROUP: I ANY CHANGES TO THESE DETAILS RECEIVING EDGE NAILING FROM ABUTTING PANELS SHALL NOT BE LESS THAN A SINGLE 3-INCH N w <br /> NOMINAL MEMBER. ADDITIONALLY, WHERE SHEARWALLS ARE SHEATHED ON BOTH FACES, ALL : <br /> 2. SPECTRAL RESPONSE ACCELERATION (Ss); 124.0% G STUDS AND PLATES RECEIVING EDGE NAILING FROM BOTH FACES MUST BE A SINGLE 3-INCH -4 J I'l <br /> 3. SITE CLASS: D (ASSUMED) GENERAL NOMINAL MEMBER OR PANEL JOINTS MUST BE STAGGERED. IN EACH OF THESE CASES 3x U o <br /> 4. SPECTRAL RESPONSE COEFFICIENTS (SDS): 82.7%G STUDS ARE REQUIRED UNLESS SPECIFICALLY NOTED OTHERWISE ON THE PLANS BY THE m <br /> . <br /> 1. ALL MATERIALS AND WORKMANSHIP SHALL <br /> 5. SEISMIC DESIGN CATEGORY: D CONFORM TO THE CONTRACT DRAWINGSENGINEER. FOR SHEARWALLS. #3 AND #4, A 2x SILL PLATE MAY BE USED IF TWO TIMES THE 4-16. BASIC SEISMIC-FORCE-RESISTING SYSTEM: NUMBER OF ANCHOR BOLTS REQUIRED BY THE SHEARWALL SCHEDULE ARE USED AND ARE (f <br /> SHEARWALLS 2. DURING THE CONSTRUCTION PERIOD THE EVENLY SPACED (SEE 2003 IBC SECTION 2305.3.10). <br /> 7. DESIGN BASE SHEAR: SEE CALCULATIONS CONTRACTOR SHALL BE RESPONSIBLE FOR THE <br /> 8. SEISMIC RESPONSE COEFFICIENT (Cs): 0.089 SAFETY OF THE BUILDING. THE CONTRACTOR 4. SHEARWALL NAILING CRITERIA IS BASED ON TABLE 2306.4.1 OF THE INTERNATIONAL <br /> 9. RESPONSE MODIFICATION FACTOR (R): 6.5 SHALL PROVIDE ADEQUATE SHORING, BRACING, - BUILDING CODE (FOR CDX) OR REPORT NER-124 (FOR OSB). VALUES ARE BASED ON HEM-FIR <br /> 10. ANALYSIS PROCEDURE USED: EQUIVALENT LATERAL AND GUYS IN ACCORDANCE WITH ALL NATIONAL, N0. 2 FRAMING WITH COMMON NAILS. <br /> FORCE PROCEDURE STATE, AND LOCAL SAFETY ORDINANCES. ANY <br /> DEVIATION MUST BE APPROVED IN WRITING 5. HOEDOWNS AND OTHER CONNECTIONS MAY BE REQUIRED AT THE ENDS OF MANY LL.I �� N <br /> FRAMING LUMBER PRIOR TO ERECTION. SHEARWALLS. SIZES AND LOCATIONS OF THESE CONNECTORS ARE INDICATED ON THE PLANS. N <br /> 1. FRAMING LUMBER SHALL BE HEM-FIR NO. 2. REFER TO THE APPROPRIATE DETAILS AND/OR HOLDOWN SCHEDULE FOR ADDITIONAL <br /> GRADES ARE TYPICAL UNLESS OTHERWISE NOTED 3. ALL ERECTION PROCEDURES SHALL CONFORM INFORMATION REGARDING ANCHOR BOLTS, EMBEDMENT LENGTH, ETC. WHERE (2) 2x's ARE USED Q � <br /> ON PLANS. LUMBER TO BE GRADE MARKED PER TO OSHA STANDARDS. ANY DEVIATION MUST AS A HOLDOWN POST, SHEARWALL EDGE NAILING MUST BE STAGGERED INTO EACH MEMBER OF <br /> WCLIB SPECIFICATIONS. BE APPROVED BY OSHA PRIOR TO ERECTION. THE POST. 0 Q <br /> 2 STRUCTURAL SHEATHING SHALL BE APA RATED 4. THE CONTRACTOR SHALL BE SOLELY 6. ANCHOR BOLTS MUST BE EMBEDDED A MINIMUM OF 7" INTO CONCRETE OR GROUTED CMU, <br /> PLYWOOD, EXPOSURE 1 SHEATHING CONFORMING TO RESPONSIBLE FOR ALL CONSTRUCTION AND SHALL BE PLACED TO PROVIDE A MINIMUM OF 2" COVER. PROVIDE 3". COVER FOR <br /> EITHER COMMERCIAL STANDARDS P51-83, APA PROCEDURES. CONCRETE CAST AGAINST SOIL. s <br /> PRP-108, OR VOLUNTARY PRODUCT STANDARD <br /> PSE-92. PROVIDE A MINIMUM OF %?' EDGE 5. THE CONTRACTOR SHALL BE RESPONSIBLE 7. ALL MACHINE BOLTS SHALL BE ASTM A307 OR BETTER. HILTI KWIK BOLTS/SIMPSON TITEN <C W <br /> DISTANCE ON ALL NAILS AND Ys" EXPANSION JOINT FOR COORDINATING THE WORK OF ALL TRADES HD BOLTS OF THE SAME DIAMETER AS SHOWN IN THE SHEARWALL SCHEDULE MAY BE <br /> BETWEEN ALL PANEL EDGES. MINIMUM SHEATHING AND SHALL CHECK ALL DIMENSIONS. ALL SUBSTITUTED FOR ANCHOR BOLTS INTO EXISTING CONCRETE. BOLTS SHALL BE EMBEDDED A 0 <br /> REQUIREMENTS ARE AS FOLLOWS: DISCREPANCIES SHALL BE CALLED TO THE MINIMUM OF 5". INTO EXISTING CONCRETE. r- W <br /> ROOF SHEATHING TO BE 7%2" INT-APA RATED ATTENTION OF THE ENGINEER AND BE RESOLVED N <br /> PLYWOOD OR 3.6" OSB WITH EXTERIOR GLUE, PRIOR TO PROCEEDING WITH THE WORK. 8. ALL NAILS AND CONNECTORS IN CONTACT WITH PRESSURE TREATED WOOD (EXCEPT FOR Lli <br /> P.I. 24/0. NAIL WITH 8d NAILS AT 6" ON BORITE TREATED WOOD) MUST BE HOT DIPPED GALVANIZED OR STAINLESS STEEL TO RESIST <br /> CENTER AT PANEL EDGES AND 12" ON 6. DRAWINGS INDICATE GENERAL AND TYPICAL CORROSION. <br /> CENTER AT INTERMEDIATE MEMBERS. DETAILS OF CONSTRUCTION. WHERE CONDITIONS <br /> ARE NOT SPECIFICALLY INDICATED BUT ARE OF <br /> SUB FLOORING TO BE 3/a" TONGUE ANDSIMILAR CHARACTER TO DETAILS SHOWN, 9_ WHERE 10d NAILS ARE SPACED AT 3" ON CENTER OR LESS, NAILS MUST BE STAGGERED. <br /> - <br /> GROOVE C-D INT-APA RATED PLYWOOD OR SIMILAR DETAILS OF CONSTRUCTION SHALL BE 10. OSB OF EQUAL OR GREATER THICKNESS MAY BE SUBSTITUTED FOR CDX SPECIFIED IN <br /> 24. GLUE <br /> OSB WITH EXTERIOR GLUE, P.I. 48 USED SUBJECT TO REVIEW BY THE ENGINEER. <br /> / SHEARWALL SCHEDULE. <br /> AND NAIL WITH 10d NAILS AT 6" ON CENTER 7. ALL DETAILS DESIGNATED AS STANDARD OR STAGGER SHEARWALL EDGE NE-SIDED SHEARWALL PER PLAN <br /> AT PANEL EDGES AND 12" ON CENTER AT TYPICAL SHALL OCCUR IN ADDITION TO ANY NAILING INTO EACH STUD <br /> INTERMEDIATE MEMBERS. OTHER SPECIFIC DETAIL CALLED OUT. <br /> STAGGER SHEARWALL EDGE <br /> 3. NAILING SHALL CONFORM TO TABLE 2304.9.1 OF 8. ALL INFORMATION SHOWN ON THE DRAWINGS NAIUNG INTO EACH STUD <br /> THE INTERNATIONAL BUILDING CODE UNLESS NOTED RELATIVE TO EXISTING CONDITIONS IS GIVEN AS <br /> OTHERWISE. USE COMMON NAILS THROUGHOUT THE BEST PRESENT KNOWLEDGE, BUT WITHOUT Drawn By. CHRIS <br /> UNLESS NOTED OTHERWISE. GUARANTEE OF-ACCURACY. WHERE ACTUAL Checked By.CHRIS: <br /> CONDITIONS CONFLICT WITH THE DRAWINGS, <br /> Date:04-26-13 <br /> 4. NO STRUCTURAL MEMBER SHALL BE CUT OR THEY SHALL BE REPORTED TO THE ENGINEER <br /> NOTCHED UNI SDA JOB NO.ESS SPECIFICALLY DETAILED OR SO THE PROPER REVISIONS MAY BE MADE. HOLDOWNS PER PLAN 0 0 <br /> APPROVED IN WRITING BY THE STRUCTURAL MODIFICATIONS TO CONSTRUCTION DETAILS INSTALLED PER <br /> ENGINEER. SHALL NOT BE MADE WITHOUT PRIOR WRITTEN TWO-SIDED SHEARWALL PER PLAN MANUFACTURER <br /> APPROVAL BY THE ENGINEER. STRUCTURAL / <br /> 5. PROVIDE PROPERLY SIZED WASHERS UNDER DOUBLE HOEDOWNS Q SHEARWALL CORNER NOTES <br /> HEADS AND NUTS OF ALL BOLTS AND LAG SCREWS _..._...... <br /> BEARING ON WOOD. (TWO SIDED MEETS ONE SIDED) <br /> S- 1 . <br /> i =j'-0" ��/ <br />