Laserfiche WebLink
• <br /> • <br /> COMcheck Software Version 4.0.2.3 <br /> Inspection Checklist <br /> Energy Code: 2012 IECC <br /> Requirements: 0.0% were addressed directly in the COMcheck software <br /> Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each <br /> requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception <br /> is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. <br /> Section <br /> # Plan Review Complies? Comments/Assumptions <br /> & Re .ID <br /> C103.2 Plans, specifications, and/or ❑Complies <br /> [PR211 calculations provide all information ❑Does Not <br /> with which compliance can be <br /> determined for the mechanical ❑Not Observable <br /> systems and equipment and ❑Not Applicable <br /> document where exceptions to the <br /> standard are claimed. Load <br /> calculations per acceptable <br /> engineering standards and <br /> handbooks. <br /> C103.2 Plans, specifications, and/or ❑Complies <br /> [PR3]1 calculations provide all information ❑Does Not <br /> with which compliance can be <br /> determined for the service water ❑Not Observable <br /> heating systems and equipment and ❑Not Applicable <br /> document where exceptions to the <br /> standard are claimed. Hot water <br /> system sized per manufacturer's <br /> sizing guide. <br /> Additional Comments/Assumptions: <br /> 11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3) <br /> Project Title: UBS- EVERETT Report date: 0 /16 <br /> Data filename: \\Cdpepc-fs-1\projects\UBS-\EVERETT,WA\PROJECT UBS-1172 1604 Hewitt Avenue, 6th Flr, Page 2 of 9 <br /> Everett, WA\PROJECT INFORMATION\Com Check\LTG 2012.cck <br />