Laserfiche WebLink
, <br /> Residential Photovoltaic Q i C Permit Application <br /> 6i S 7 <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed <br /> In this Checklist.All project plans and supporting documentation must be provided on site for the Inspector. <br /> --------TO BE COMPLETED BY APPLICANT------- <br /> (10 <br /> Project Information <br /> Property Owner Name: PAUL&COLLEEN FRANKLIN <br /> Project Address: 1701 Puget Dr Parcel# 00393900501201 <br /> City: Everett State: WA ZIP: 98203 <br /> Day Phone: (425)750-4270 <br /> Contractor Name Smart Energy Today <br /> Contractor License#: SMARTET869RJ <br /> Contractor Day Phone: 360-339-6660 <br /> PV system description Installation of 5.8kW residential rooftop solar PN system with <br /> (include manufacturer Micro inverters equipped with automatic rapid shutdown <br /> and model#of PV (20x) Modules- Itek Energy IT290-SE <br /> modules and (10x) Micro-Inverter-Blue Frog Solar YC500-MIW <br /> inverters): <br /> (RDE-Leirnirie h V9LIF project quMifies r©r eltpeslitesl <br /> Yes No <br /> 1. PV system is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure that <br /> Is code compliant to setbacks and height,or code allows expansion of nonconformity for <br /> solar modules.[IRC 101.21 <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by ❑ <br /> the local jurisdiction. <br /> 3. Rooftop is made from lightweight material such'as a single layer of composition shingles, El <br /> I roofing,lightweight masonry,or cedar shingles. <br /> 4. The installation shall comply with the manufacturer's instructions.[IRC M2302.21 ❑ <br /> 5. The installation shall meet the requirements of NFPA 70 National Electric Code,and all <br /> required electrical permit(s)must be obtained from the Authority Having Jurisdiction to Gd' ❑ <br /> administer the electrical code.[IRC M2302.2] <br /> 6. The installation shall meet the requirements of the international Fire Code as amended ❑ <br /> by WA State.[IRC M2302.2] <br /> 7. The PV system is designed for the wind speed of the local area,and will be Installed per ❑ <br /> the manufacturer's specifications. [IRC M2302.2.1(1)] <br /> 8. The ground snow load does not exceed 70 pounds per square foot.[IRC M2302.2.1(2)] GV ❑ <br /> 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances <br /> weigh no more than-four pounds per-square foot.[IRC M2302.2.1(3)1 G7' ❑ <br /> Enter total dead load of system(Ibs/ft'): <br /> 10. To address uplift,modules are mounted no higher than 18"above the surface of the ❑ <br /> roofing to which they are affixed.[IRC M2302.2.1(4)] <br /> I <br />