Laserfiche WebLink
INSPECTION REPORT <br /> Date: 9-9 - ho Permit: <br /> Contractor: <br /> L Owner: <br /> Site Address: LAW Sy�l � � <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> oningh El Structural Slab ❑OK to insulate El OK to insulate <br /> c E]Framing ❑ Rooftop Units ElWater Service❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTH.EE4 OR CONSULTATION: <br /> 61-AP-PROAl- ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> v t <br /> Inspector: Date. <br /> EIR(4/09) /C Nf�7t t,:-,_I))ROTIONS•425/4118-8900 <br />