My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/03/29 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/03/29 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2017 10:24:50 AM
Creation date
8/14/2017 10:23:59 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/29/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> amendment No. 2 to Briefing COUNCIL BILL# <br /> Professional Services Proposed Action Originating Department Public Works <br /> Agreement with GeoEngineers, Consent Contact Person Ed Fisher,P.E. <br /> Inc. for the Lake Chaplain X Action Phone Number 425-257-8932 <br /> Road Culvert Replacement First Reading FOR AGENDA OF March 29,2017 <br /> Project. Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> Water Filtration Plant June 15, 2015 Amendment No. 2 Legal,Public Works <br /> Professional Services <br /> Agreement <br /> April 20,2016 <br /> Amendment No.1 <br /> Amount Budgeted $600,000.00 <br /> Account Number(s): UP3616-1 <br /> Expenditure Required $169,561.00 $145,552.00 + $24,009.00 <br /> Budget Remaining $430,439.00 <br /> Additional Required 0 <br /> DETAILED SUMMARY STATEMENT: <br /> Amendment No. 2 extends the time of completion of agreement and adds engineering services related to <br /> recent site condition assessment addressing imminent premature site failure due to recent storm events. The <br /> cost of this additional work will not exceed$24,009. The additional services include revised technical design <br /> and project support as necessary to meet specific final permitting requirements including: <br /> • support for alternative permitting requirements <br /> • preparation of geotechnical memo regarding current embankment conditions <br /> • preparation of additional response memos to permit agencies <br /> • drawing revisions for final permitted culvert <br /> • technical support during fmal permitting upon request from City of Everett as needed <br /> The present Agreement for$145,552.00 is modified so that total compensation,including all services and <br /> expenses, shall not exceed$169,561.00. <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment No. 2 to the1Pgfessional Services Agreement with GeoEngineers, <br /> Inc. for the Lake Chaplain Road culvert replacement project in an amount not to exceed$24,009.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.