Laserfiche WebLink
(2) Following the approval of the Division 9 Binding Site Plan, Owner <br /> will construct a detention pond facility on Tract 999 of Division 9 to serve Lot 1, <br /> Lot 2 and Transfer Lot 3, and will provide the necessary pipes for connecting the <br /> stormwater drainage from Transfer Lot 3 following the construction of Tract 999, <br /> at Owner's expense. This detention pond facility must be connected to the Merrill <br /> &Ring Creek drainage basin. Unless determined otherwise by the City this <br /> drainage facility will be built, owned, operated and maintained by Owner or the <br /> Association at its expense. <br /> (3) This Section 1.9(c)will survive the respective Closing Dates and <br /> will be fully enforceable by the parties after such Closing Dates,including for the <br /> purpose of clarity, Owner's successors and assigns. <br /> 1.10 Landscaping. The City agrees that the.landscaping to be cultivated,maintained, <br /> or replaced by the City on the slopes of each of the Transfer Lots shall be consistent with the <br /> City's applicable law, ordinances,and requirements. <br /> 1.11 Indemnification. <br /> (a) Indemnification by Owner. Other than as provided in Section 1.5, <br /> Owner shall be responsible to the City for, and shall defend, indemnify,and hold the City <br /> harmless from and against, loss, damage, liability, cost, or expense(including,without <br /> limitation, reasonable attorneys' fees, legal expenses and consultants' fees),that shall be suffered <br /> by the City,resulting from or relating to: <br /> (1) Claims or demands made by third parties against the City with <br /> regard to the ownership, management, or use of the Transfer Lots prior to and <br /> including the applicable Closing Date, including,without limitation, any claims <br /> 17 <br /> 131047136.14 <br /> A A <br />