Laserfiche WebLink
EVERETT COMPREHENSIVE PLAN <br />Project <br />IQ. <br />Pv h TM; �k <br />z ` Project Nance pf JuattliCh r3(fi5 <br />6 <br />Al 9 2020 <br />201 -. <br />6�fY 2021�2Q35: <br />Total _ .dotal <br />S-11 <br />WFP WATER STANDPIPE REPLACEMENT Source Maintenance <br />0.10 <br />1.22 <br />1.32 0.00 <br />1.32 <br />SOURCE SUB �OT.1.Q <br />. 7,24. <br />,'x0.26 <br />� - 1.6T x4.35 <br />9 S6 ..x3A� <br />` :33.00 <br />T-1 RES 2 AND VALVE HOUSE REPLACEMENT (70%) Transmission Operational <br />0.70 <br />4.90 <br />4.90 <br />10.50 0.00 <br />10.50 <br />T-2 CATHODIC PROTECTION - BONDING PIPELINES Transmission Maintenance <br />0.05 <br />0.33 <br />0.30 <br />0.25 0.25 0.25 <br />1.43 0.20 <br />1.63 <br />T-3 CROSS -TIE TRANSMISSION LINE Transmission Operational <br />0.25 <br />3.00 <br />15.00 15.75 <br />34.00 0.00 <br />34.00 <br />T-4 PANTHER CREEK IMPROVEMENTS Transmission Operational <br />0.00 5.50 <br />5.50 <br />T-5 PIPELINE #2 REPLACEMENT PH. 9-11 Transmission Maintenance <br />0.00 5.00 <br />5.00 <br />T-6 PIPELINE #5 REPLACEMENT AT PILCHUCK RIVER Transmission Maintenance <br />2.60 <br />2.60 0.00 <br />2.60 <br />T-7 PORTAL 4 IMPROVEMENTS Transmission Operational <br />0.03 <br />0.02 <br />0.28 <br />0.33 0.00 <br />0.33 <br />T-8 THREE LAKES VALVE BY-PASS Transmission Operational <br />0.10 <br />0.90 <br />1.00 0.00 <br />1.00 <br />T-9 WATER COMPLAN - 2020 Transmission Planning <br />0.50 0.50 <br />1.00 0.00 <br />1.00 <br />T-10 WATER PIPELINE REPAIRS (UNDER WATER) Transmission Maintenance <br />1.08 2.38 0.87 <br />4.33 0.00 <br />4.33 <br />T-11 SERVICE CENTER SEISMIC UPGRADES 14% Transmission Operational <br />0.07 <br />0.07 <br />1.00 <br />1.14 0.89 1.24 <br />4.41 0.00 <br />4.41 <br />ION SUBTOTAL <br />2.85 <br />2.27 <br />...i r TOTAL <br />11.37 <br />5.93 <br />17123 <br />CAPITAL FACILITIES ELEMENT 14 <br />