Laserfiche WebLink
EVERETT COMPREHENSIVE PLAN <br />Policy 2.18.2 Processing of Permits. The City shall continue to process land use and building <br />permit applications in a fair and timely manner. The City shall periodically evaluate its permit <br />processing practices to ensure efficient and timely processing of permit applications. <br />2.19 Parking and Related Transportation Land Use Policies <br />Policy 2.19.1 Encourage complementary land uses that can share parking. <br />Policy 2.19.2 Implement parking management strategies that reduce the amount of land used for <br />parking and consider reducing parking standards for businesses that implement such strategies. <br />Policy 2.19.3 Consider adopting maximum parking standards and reducing minimum <br />requirements where appropriate. <br />Policy 2.19.4 Amend the zoning code to require bicycle parking. Offer off-street parking <br />reductions based on traffic engineering analysis for sites that provide bicycle lockers, indoor bike <br />rooms, and indoor changing and shower facilities to encourage employees to commute by <br />bicycle. <br />Policy 2.19.5 As large properties redevelop, seek ways to provide bicycle and pedestrian <br />connections to adjacent neighborhoods. <br />V. LAND USE MAP <br />A. Map <br />The Land Use Map of the Land Use Element is the official map designating the desired land use <br />pattern for the Everett of the future. The map graphically represents the Land Use Element <br />policies as they are carried out in a preferred land use pattern throughout the Everett Planning <br />Area. For example, many the goals of the Housing Element or Economic Development Element <br />will be implemented by the type of land use designation given to an area by the Land Use Map. <br />The goals of the Transportation Element will be better achieved when appropriate land use <br />designations are given to specific areas. The funding of public facilities called for by the Capital <br />Facilities Element can be more economically realized by proper land use designations. The map <br />is only to be used in conjunction with the written policies of the comprehensive plan, as the <br />policies indicate how the community wishes to implement its vision for the city, its goals and <br />objectives for land use and the other related elements of the plan. <br />When property has a Comprehensive Plan Map designation of 2.1 Schools/Churches, 2.2 <br />College/University, 2.3 Cemetery, 2.4 Hospital and 2.8 Public/Quasi Public Facilities and there <br />is a request to rezone a property, the process to be used shall be a Planning Commission/City <br />Council review as a part of the annual Comprehensive Plan Update (Review Process VA). <br />In situations where a proposed use is allowed under the existing zoning, it shall be processed <br />under the established permit process, and the Comprehensive Plan map designation should be <br />LAND USE ELEMENT 56 <br />