Laserfiche WebLink
INSPECTION REPORT <br /> Date Z-J'L-j Permit: <br /> Contractor: ),Ix N-exs <br /> Owner: "liq W_i 1 d ,0"&Q <br /> Site Address: vl I %1W SCo <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service t4raming ❑Rooftop Units ❑Water Service <br /> ❑Grounding jjjpnsulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final i(�}❑Gas Pipe Final ❑HWT Final <br /> ,1V <br /> OTHER OR CONSULTATION: --IZ�7 l` 1– ?j G- Y—Nt \ <br /> ❑ <br /> APPROVAL F-] PARTIALAPPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. F-1CORRECTIONREQUESTED <br /> F-] OKFOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION–24 hour notice required <br /> U <br /> Inspector: Date: . <br /> EIR(10/06) ATABAR,INC. <br />