Laserfiche WebLink
Kirk Brooks <br /> From: Jack Molver <Jnm@deainc.com> <br /> Sent: Wednesday, November 02, 2016 4:13 PM <br /> To: Kirk Brooks <br /> Cc: Randy Brown; 'Tom Deering' <br /> Subject: RE: Landscape Plans for 6201 Associated Blvd <br /> Kirk, <br /> The proposed revision will have no impact on the existing stormwater system serving the project for the following <br /> reasons: <br /> 1. A reduction of 3,083 SF of landscaping is insignificant considering the size of the development. <br /> 2. In addition, the required parking landscape area is 26,040 SF. The plan provides.32,534 SF even with the <br /> proposed revision. <br /> 3. The site drains to the Glenwood Creek regional detention system on Associated Boulevard. This facility is <br /> partially an infiltration facility. <br /> For these reasons, the reduction in area will have no impact on the stormwater facility capacity. <br /> Jack N. Molver, PE I Vice President <br /> David Evans and Associates, Inc. I www.deainc.com <br /> d: 425.405.1504 1 jnmCcbdeainc.com <br /> Follow us on LinkedIn I Twitter I Facebook I YouTube <br /> From:Tom Deering [mailto:Tom.Deering@synthesispllc.com] <br /> Sent: Wednesday, November 02, 2016 1:49 PM <br /> To: Kirk Brooks (kbrooks@everettwa.gov) <kbrooks@everettwa.gov> <br /> Cc:Jack Molver<Jnm@deainc.com>; Randy Brown <randy.brown @synthesispllc.com> <br /> Subject: Landscape Plans for 6201 Associated Blvd <br /> Kirk, <br /> Thank you for taking a look at this so quickly. <br /> Here are the revised landscape plans we spoke about. Let me know if you need hard copies. <br /> Thank you, <br /> Tom <br /> Tom Deering <br /> Architect <br /> SynThesisPLLC <br /> 12503 Bel-Red Road,Suite 101 <br /> 1 <br />