Laserfiche WebLink
2015 Washington State Energy Code Compliance Forms for Commercial,R2 and R3 over 3 stories and all R 1-Page 7 of 7 <br /> MechPermit <br /> • r <br /> ns Checklist <br /> 2015 Washington State Energy Code Compliance Forms for Commercial Buildings inducting R2 a ft3 over 3 stories and all R1 Revised January 2917 <br /> Project Title: JDST.f. Date 2/2/2017 <br /> The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the <br /> Washington State Energy Code,Commercial Provisions. <br /> Applicable Code Section Code Provision Location in Building Department <br /> {es,no,na Information Required-Mustbe in permit documents <br /> Documents Notes <br /> CC4137� Application of single dud Indicate VAV terminal types on plans;verify fan-powered terminal units only serve perimeter <br /> NAnd fan-powered terminal Y <br /> nits zones with envelope loads;verify all other zones are served by single dud terminal units <br /> an-powered terminal unit Indicate DOC controls are configured to automatically reset the primary supply air cfm setpoint <br /> NA imary air reset of allfan-powered terminal units to the minimum required to maintain ventilation during <br /> occupied heating ordeadband,based upon the VAV air handling unit OSA ventilation fraction <br /> Forspaces>150 sfwith occupant density z 25 people/1000 sf,indicate space is served by a <br /> NA igh occupancy space dedicated terminal unit with DCV control that resets terminal unit ventilation setpoint;also <br /> ntrols indicate occupancy sensor control that automatically reduces minimum ventilation to zero and <br /> sets back room heating and cooling setpoints by a 5°F <br /> For server,electronic equipment,telecom or similar spaces with coding loads>5 W/sf, <br /> NA . , Dedicated HVAC systems indicate spaces are served by independent HVAC systems that are separate from HPVAV <br /> Item 14 systems serving rest of budding;indicate dedicated HVAC systems have air economizer <br /> controls or energy recovery per C403.3 Exception 9 <br /> Indicate whether systems are served by a high efficiency heating water plant,or a high <br /> efficiency chilled water plant <br /> If complying via high efficiency heating water plant:indicate all VAV terminals have hydronic <br /> heating coils served by heating water system with either gas-fired baiter{s)with thermal <br /> NA C403.7, efficiency a 90%,air-to-water heat pumps,or heal recovery chillers <br /> ffici <br /> Central plant eency -..-- --------- -- ---.-_._..---- -- ----...--- ---- ---- - ----- <br /> Item 15 If complying via high efficiency chilled water plant:Indicate all VAV air handlers have coofing <br /> coils served by chillers with rated IPLV efficiency that exceeds WSEC listed IPLV by at least <br /> 25%per Table C403.2.3{7)(note wafer-cooled IPLV is max,all others are min);indicate <br /> smallest chiller or compressor in plant is:5 20%of total plant capacity,or provide thermal <br /> storage sized for<-20%of total plant capacity <br /> 0403.7. Fault detection and indicate DOC system includes a fault detection and diagnostics(FDO)system configured to <br /> NA Item 16 diagnostics monitor operation and provide fault reporting of required parameters for aft VAV air handlers <br /> and VAV air terminal units in the HPVAV system <br /> HVAC Equipment Energy Use Metering <br /> HVAC equipment energy For new buildings>50,000 sf and building additions>25,000 sf,verify energy use metering of <br /> NA 0409.3-1 use metering all equipment used to provide space heating and cooling,dehumidification and ventilation will <br /> be provided per C409;indicate equipment eligible for exception <br /> Documentation and System Specific Requirement To Support Commissioning <br /> indicate that all mechanical systems,equipment,and controls for which the WSEC requires <br /> control functions and /or configuration to perform specific functions are required to be <br /> Scope of mechanical commissioned; M-C <br /> Yes 0408.2 ------- _- _.. <br /> systems commissioning For buildings with z 240,000 Bluth total output cooling capacity ora 300,000 Btulh total output <br /> heating capacity,Indicate that all mechanical systems regardless of individual capacity are <br /> required to be commissioned;or provide building heating/cooling capacity calculation <br /> demonstrating eligibility for exception fill <br /> Indicate in plans and specifications that Cx per C408 is required for all applicable mechanical <br /> systems; <br /> 0403.2.10 ------- - �A C <br /> - <br /> generalInclude <br /> summary with at a minimum of Items 1 thru 4 of the Cx plan per C408.1.2 <br /> 0408.1.1 Commissioning including:narrative description of activities,responsibilities of the Cx team,schedule of <br /> Yes C408.1.2 requirements in construction activities including verification of project dose out documentation per C 103.6,and conoid of <br /> C408.1.4.2 documents interest plan(if required); <br /> C1M-C03.6 --- --- ---- _..-.._...--...._.... ------ - - --C — <br /> Include in general summary that a Cx project report or Compliance Checklist(Figure <br /> C408.1.4.2)shall be completed by the Certified Cx Professional and provided to the owner <br /> prior to the final mechanical inspection. M-C <br /> Air system and hydronic Indicate in plans that air and fluid flow rates shall be tested and balanced within the tolerances <br /> Yes C408.2.2 system balancing defined in the specifications;indicate systems shall be balanced in a manner to first minimize <br /> throttling losses,then adjusted to meet design flow conditions M-C <br /> C408.2.2.1 Air system balancing Indicate devices that provide the capability to balance all supply air outlets,zone terminals and <br /> devices air handling equipment requiring system balancing M-1 <br /> NA C408.2,2.2 Hydronic system balancing Indicate devices that provide the capability to isolate,balance and measure flow across all <br /> devices hydronic equipment requiring system balancing including heating and cooling coils and pumps <br /> Yes C408.2.3 Functional performance Identify in plans and specifications the intended operation of all equipment and controls during <br /> testing criteria all modes of operation,including interfacing between new and exisfing4o-remain systems IM-C <br /> Project Close Out Documentation <br /> Documentation and project Indicate in plans that project close out documentation and training of building operations <br /> Yes 0103.6 close out submittal personnel is required for all mechanical components,equipment and systems governed by <br /> requirements this code;indicate close out documentation shall Include:record documents,O&M manuals. <br /> applicable WSEC compliance forms and calculations M-C <br /> 9 <br />