My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6201 ASSOCIATED BLVD JDS INC 2018-03-29
>
Address Records
>
ASSOCIATED BLVD
>
6201
>
JDS INC
>
6201 ASSOCIATED BLVD JDS INC 2018-03-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 1:19:46 PM
Creation date
8/17/2017 8:51:15 AM
Metadata
Fields
Template:
Address Document
Street Name
ASSOCIATED BLVD
Street Number
6201
Tenant Name
JDS INC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2015 Washington State Energy Code Compliance Forms for Commercial,R2 and R3 over 3 stories and all R 1-Page 7 of 7 <br /> MechPermit <br /> • r <br /> ns Checklist <br /> 2015 Washington State Energy Code Compliance Forms for Commercial Buildings inducting R2 a ft3 over 3 stories and all R1 Revised January 2917 <br /> Project Title: JDST.f. Date 2/2/2017 <br /> The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the <br /> Washington State Energy Code,Commercial Provisions. <br /> Applicable Code Section Code Provision Location in Building Department <br /> {es,no,na Information Required-Mustbe in permit documents <br /> Documents Notes <br /> CC4137� Application of single dud Indicate VAV terminal types on plans;verify fan-powered terminal units only serve perimeter <br /> NAnd fan-powered terminal Y <br /> nits zones with envelope loads;verify all other zones are served by single dud terminal units <br /> an-powered terminal unit Indicate DOC controls are configured to automatically reset the primary supply air cfm setpoint <br /> NA imary air reset of allfan-powered terminal units to the minimum required to maintain ventilation during <br /> occupied heating ordeadband,based upon the VAV air handling unit OSA ventilation fraction <br /> Forspaces>150 sfwith occupant density z 25 people/1000 sf,indicate space is served by a <br /> NA igh occupancy space dedicated terminal unit with DCV control that resets terminal unit ventilation setpoint;also <br /> ntrols indicate occupancy sensor control that automatically reduces minimum ventilation to zero and <br /> sets back room heating and cooling setpoints by a 5°F <br /> For server,electronic equipment,telecom or similar spaces with coding loads>5 W/sf, <br /> NA . , Dedicated HVAC systems indicate spaces are served by independent HVAC systems that are separate from HPVAV <br /> Item 14 systems serving rest of budding;indicate dedicated HVAC systems have air economizer <br /> controls or energy recovery per C403.3 Exception 9 <br /> Indicate whether systems are served by a high efficiency heating water plant,or a high <br /> efficiency chilled water plant <br /> If complying via high efficiency heating water plant:indicate all VAV terminals have hydronic <br /> heating coils served by heating water system with either gas-fired baiter{s)with thermal <br /> NA C403.7, efficiency a 90%,air-to-water heat pumps,or heal recovery chillers <br /> ffici <br /> Central plant eency -..-- --------- -- ---.-_._..---- -- ----...--- ---- ---- - ----- <br /> Item 15 If complying via high efficiency chilled water plant:Indicate all VAV air handlers have coofing <br /> coils served by chillers with rated IPLV efficiency that exceeds WSEC listed IPLV by at least <br /> 25%per Table C403.2.3{7)(note wafer-cooled IPLV is max,all others are min);indicate <br /> smallest chiller or compressor in plant is:5 20%of total plant capacity,or provide thermal <br /> storage sized for<-20%of total plant capacity <br /> 0403.7. Fault detection and indicate DOC system includes a fault detection and diagnostics(FDO)system configured to <br /> NA Item 16 diagnostics monitor operation and provide fault reporting of required parameters for aft VAV air handlers <br /> and VAV air terminal units in the HPVAV system <br /> HVAC Equipment Energy Use Metering <br /> HVAC equipment energy For new buildings>50,000 sf and building additions>25,000 sf,verify energy use metering of <br /> NA 0409.3-1 use metering all equipment used to provide space heating and cooling,dehumidification and ventilation will <br /> be provided per C409;indicate equipment eligible for exception <br /> Documentation and System Specific Requirement To Support Commissioning <br /> indicate that all mechanical systems,equipment,and controls for which the WSEC requires <br /> control functions and /or configuration to perform specific functions are required to be <br /> Scope of mechanical commissioned; M-C <br /> Yes 0408.2 ------- _- _.. <br /> systems commissioning For buildings with z 240,000 Bluth total output cooling capacity ora 300,000 Btulh total output <br /> heating capacity,Indicate that all mechanical systems regardless of individual capacity are <br /> required to be commissioned;or provide building heating/cooling capacity calculation <br /> demonstrating eligibility for exception fill <br /> Indicate in plans and specifications that Cx per C408 is required for all applicable mechanical <br /> systems; <br /> 0403.2.10 ------- - �A C <br /> - <br /> generalInclude <br /> summary with at a minimum of Items 1 thru 4 of the Cx plan per C408.1.2 <br /> 0408.1.1 Commissioning including:narrative description of activities,responsibilities of the Cx team,schedule of <br /> Yes C408.1.2 requirements in construction activities including verification of project dose out documentation per C 103.6,and conoid of <br /> C408.1.4.2 documents interest plan(if required); <br /> C1M-C03.6 --- --- ---- _..-.._...--...._.... ------ - - --C — <br /> Include in general summary that a Cx project report or Compliance Checklist(Figure <br /> C408.1.4.2)shall be completed by the Certified Cx Professional and provided to the owner <br /> prior to the final mechanical inspection. M-C <br /> Air system and hydronic Indicate in plans that air and fluid flow rates shall be tested and balanced within the tolerances <br /> Yes C408.2.2 system balancing defined in the specifications;indicate systems shall be balanced in a manner to first minimize <br /> throttling losses,then adjusted to meet design flow conditions M-C <br /> C408.2.2.1 Air system balancing Indicate devices that provide the capability to balance all supply air outlets,zone terminals and <br /> devices air handling equipment requiring system balancing M-1 <br /> NA C408.2,2.2 Hydronic system balancing Indicate devices that provide the capability to isolate,balance and measure flow across all <br /> devices hydronic equipment requiring system balancing including heating and cooling coils and pumps <br /> Yes C408.2.3 Functional performance Identify in plans and specifications the intended operation of all equipment and controls during <br /> testing criteria all modes of operation,including interfacing between new and exisfing4o-remain systems IM-C <br /> Project Close Out Documentation <br /> Documentation and project Indicate in plans that project close out documentation and training of building operations <br /> Yes 0103.6 close out submittal personnel is required for all mechanical components,equipment and systems governed by <br /> requirements this code;indicate close out documentation shall Include:record documents,O&M manuals. <br /> applicable WSEC compliance forms and calculations M-C <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.