Laserfiche WebLink
2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 <br /> ! • • • F14 rele . a <br /> 2015 Washington State Energy Code Compliance Farms for Commercial Buildings including R2&R3 over 3 stories and all RRevised January 2017 <br /> Project Title: JDS T.I. <br /> Date 2/2/2027 <br /> The following information shall be included in the load calculation program summary submitted with For Building Dept. Use <br /> the permit documents. If a load calculation summary is not available,provide the required information <br /> below. <br /> Heating Design Cooling Design <br /> Load in Btu/h(Note Load in Btu/h(Note Calculation Method <br /> Equip. ID Area(s)Served 1) 1) (Note 2) Notes <br /> RTU-1 Offices 33,700 Btu/h 63,100 Btu/h Computer load <br /> calculation <br /> Note 1-Design load shad account for the building envelope,lighting, ventilation and occupancy loads of the space(s)served by the <br /> mechanical system.Heating and cooling loads shall be adjusted to account for load reduction achieved by an energy recovery <br /> system,if applicable. <br /> Note 2-Computer load calculation program, worksheet(identify source),or equivalent computation procedure in accordance with ASHRAE <br /> Standard 183. <br /> r <br />