My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD PEDESTRIAN TUNNEL 2017-08-17
>
Address Records
>
W CASINO RD
>
3003
>
PEDESTRIAN TUNNEL
>
3003 W CASINO RD PEDESTRIAN TUNNEL 2017-08-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2017 10:37:14 AM
Creation date
8/17/2017 10:37:08 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
PEDESTRIAN TUNNEL
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> INDEX OF DRAWINGS <br /> SHEET NO. DRAWING TITLE DATE SHEET NO. DRAWING TITLE DATE SHEET NO. DRAWING TITLE DATE SHEET NO. DRAWING TIT[F <br /> GENERAL STRUCTURAL STRUCTURAL (CONT.) <br /> 40-024- -103 COVER SHEET 02.23.2017 0-024-TNS3R-300 REMOVAL COMPOSITE TUNNEL PLAN 01.14.2016 40-024-1S63-800 PARTIAL FIRST FLOOR SLAB PLAN 08.15.2016 <br /> 40-024-GOe-300 COVER SHEET 05.06.2016 0-024-TNS10-12R-300 PARTIAL TUNNEL PLAN REMOVAL 02.29.2016 40-024-iS64-700 PARTIAL FIRST FLOOR SLAB PLAN 09.07.2016 <br /> 40-024-GOe-301 COVER SHEET 02.27.2017 -024-TNS10-16R-300 PARTIAL TUNNEL PLAN REMOVAL 02.29.2016 40-024-1564-801 PARTIAL FIRST FLOOR SLAB PLAN 06.07.2016 <br /> 40-024-GOg-700 COVER SHEET 11.14.2016 0-024-TNS10-1713-300 PARTIAL TUNNEL PLAN REMOVAL 02.29.2016 40-024-1S65-301 SLAB PLAN 02.27.2017 <br /> 40-024-00-800 COVER SHEET 08.15.2016 0-024-TNS10-18R-300 PARTIAL TUNNEL PLAN REMOVAL 02.29.2016 40-024-1565-700 PARTIAL SLAB PLAN 11.14.2016 <br /> 40-024-GOg-801 COVER SHEET 06.07.2016 40-024-1566-300 PARTIAL FIRST FLOOR SLAB PLAN 0.24.2016 <br /> 0-024-iS3R-300 COMPOSITE SLAB PLAN REMOVAL 02.29.2016 40-024-1S66-301 SLAB PLAN 02.27.2017 <br /> 40-024-Gid-300 ABBREVIATIONS AND GENERAL NOTES 05.06.2016 0-024-1S3R-301 COMPOSITE SLAB REMOVAL PLAN 02.27.2017 40-024-1566-700 PARTIAL SLAB PLAN 1.14.2016 <br /> 0-024-iS3R-700 REMOVAL COMPOSITE FLOOR PLAN 02.29.2016 40-024-1S67-300 PARTIAL FIRST FLOOR SLAB PLAN 0.24.2016 <br /> 40-024-G2e-103 SHEET INDEX 02.23.2017 40-024-1567-700 PARTIAL FIRST FLOOR SLAB PLAN 10.24.2016 <br /> 40-024-G2e-300 SHEET INDEX 10.24.2016 0-024-iS60R-700 PARTIAL SLAB PLAN REMOVAL 11.14.2016 40-024-1567-800 PARTIAL FIRST FLOOR SLAB PLAN 08.15.2016 <br /> 40-024-G2e-301 SHEET INDEX 0_2.27.2017 0-024-1S60R-301 SLAB REMOVAL PLAN 02.27.2017 40-024-iS68-300 PARTIAL FIRST FLOOR SLAB PLAN 10.24.2016 <br /> 40-024-G2e-700 SHEET INDEX 11.14.2016 0-024-1S61R-300 PARTIAL SLAB PLAN REMOVAL 02.29.2016 40-024-iS68-700 PARTIAL FIRST FLOOR SLAB PLAN 0.24.2016 <br /> 40-024-G2e-800 SHEET INDEX 08.15.2016 0-024-1S61R-301 SLAB REMOVAL PLAN 02.27.2017 40-024-1568-800 PARTIAL FIRST FLOOR SLAB PLAN 08.15.2016 <br /> 0-024-iS62R-300 PARTIAL SLAB PLAN REMOVAL 02.29.2016 40-024-1569-700 PARTIAL FIRST FLOOR SLAB PLAN 10.24.2016 <br /> 40-024-G2f-300 SHEET INDEX 1024.2016 0-024-1S63R-300 PARTIAL SLAB PLAN REMOVAL 02.29.2016 40-024-1569-801 PARTIAL FIRST FLOOR SLAB PLAN 06.07.2016 <br /> 40-024-G2f-301 SHEET INDEX 02.27.2017 40-024-1S65R-301 SLAB REMOVAL PLAN 02.27.2017 40-024-1569-300 PARTIAL FIRST FLOOR SLAB PLAN 10.24.2016 <br /> 40-024-G2f-700 SHEET INDEX 11.14.2016 40-024-1S65R-700 PARTIAL SLAB PLAN REMOVAL 11.14.2016 40-024-1S70-301 SLAB PLAN 02.27.2017 <br /> 40-024-G2f-800 SHEET INDEX 08.15.2016 0-024-iS66R-300 PARTIAL SLAB PLAN REMOVAL 2.29.2016 40-024-1571-301 SLAB PLAN 02.27.2017 <br /> 0-024-iS66R-301 SLAB REMOVAL PLAN D2.27.2017 <br /> 40-024-G2g-301 SHEET INDEX 02.27.2017 0-024-iS66R-700 PARTIAL SLAB PLAN REMOVAL 11.14.2016 40-024-2S116R-7DO REMOVAL PARTIAL FLOOR FRAMING PLAN 02.29.2016 <br /> 0-024-iS67R-300 PARTIAL SLAB PLAN REMOVAL D2.29.2016 40-024-2S117R-700 REMOVAL PARTIAL FLOOR FRAMING PLAN 02.29.2016 <br /> 0-024-1S68R-300 PARTIAL SLAB PLAN REMOVAL D2.29.2016 40-024-2S118R-300 REMOVAL PARTIAL FLOOR FRAMING PLAN 01.14.2016 <br /> 40-024-TS63R-700 REMOVAL PARTIAL FLOOR SLAB PLAN 01.14.2016 40-024-2S118R-700 REMOVAL PARTIAL FLOOR FRAMING PLAN 02.29.2016 <br /> 0-024-1S64R-300 REMOVAL PARTIAL FLOOR SLAB PLAN C1.14.2016 40-024-2S119R-300 REMOVAL PARTIAL FLOOR FRAMING PLAN 01.14.2016 <br /> ARCHITECTURAL <br /> 40-024-1S64R-700 REMOVAL PARTIAL FLOOR SLAB PLAN 01.14.2016 40-024-2S119R-700 REMOVAL PARTIAL FLOOR FRAMING PLAN 02.29.2016 <br /> 40-024-1A13R-700 PARTIAL FIRST FLOOR PLAN - REMOVAL 05.06.2016 0-024-1S69R-300 REMOVAL PARTIAL FLOOR SLAB PLAN 1.14.2016 <br /> 40-024-iS69R-700 RFMOVAI PARTIAI FIOOR STAB PIAN 01.14.2016 40-024-S280-1-700 TRENCHING DETAILS 09.07.2016 <br /> 40-024-TNA15-700 PARTIAL TUNNEL PLAN 12.13.2016 40-024-iS70R-301 SLAB REMOVAL PLAN 02.27.2017 40-024-S281-300 CONCRETE DETAILS 03.31.2016 <br /> 40-024-TNA22-700 PARTIAL TUNNEL PLAN 12.13.2016 40-024-1S71R-301 SLAB REMOVAL PLAN 02.27.2017 40-024-5281-801 CONCRETE DETAILS 04.21.2016 <br /> 40-024-5282-300 CONCRETE DETAILS 03.31.2016 <br /> 40-024-tA3-301 COMPOSITE (PARTIAL) FIRST FLOOR PLAN 02.27.2017 -024-2S3R-700 REMOVAL COMPOSITE FLOOR FRAMING PLAN 02.29.2016 40-024-5282-801 CONCRETE DETAILS 06.07.2016 <br /> 40-024-S283-800 CONCRETE DETAILS 08.15.2016 <br /> 40-024-IA10-18-700 PARTIAL FIRST FLOOR PLAN 03.07.2016 40-024-S2n-103 GENERAL NOTES 02.23.2017 40-024-5284-801 CONCRETE DETAILS 04.21.2016 <br /> 40-024-1A13-700 PARTIAL FIRST FLOOR PLAN 05.06.2016 40-024-S2n-300 GENERAL NOTES 03.31.2016 40-024-5285-801 CONCRETE DETAILS 04.21.2016 <br /> 40-024-IA15-7DO PARTIAL FIRST FLOOR PLAN 07.18.2016 40-024-S2n-301 GENERAL NOTES 02.27.2017 40-024-S286-700 CONCRETE DETAILS 09.07.2016 <br /> 40-024-1A15-700 PARTIAL FIRST FLOOR PLAN 07.18.2016 40-024-S2n-700 GENERAL NOTES 11.14.2016 40-024-5287-301 CONCRETE DETAILS 02.27.2017 _ <br /> 40-024-S2n-800 GENERAL NOTES 08.15.2016 <br /> 40-024-1Al2-800 PARTIAL FIRST FLOOR PLAN 08.15.2016 40-024-S2n-801 GENERAL NOTES 04.21.2016 40-024-S401-300 STEEL DETAILS 10.24.2016 <br /> 40-024-1A13-800 PARTIAL FIRST FLOOR PLAN 08.15.2016 40-024-5402-700 STEEL DETAILS 09.07.2016 <br /> 40-024-IA15-301 PARTIAL FIRST FLOOR PLAN 02.27.2017 40-024-S2o-103 STATEMENT OF SPECIAL INSPECTIONS 02.23.2017 <br /> 40-024-1A16-301 PARTIAL FIRST FLOOR PLAN 02.27.2017 40-024-S2o-300 STATEMENT OF SPECIAL INSPECTIONS 03.31.2016 40-024-5450-700 ENLARGE PLAN '1.172C'F <br /> 40-024-tAi6-700 PARTIAL FIRST FLOOR PLAN 10.24.2016 40-024-S2o-301 STATEMENT OF SPECIAL INSPECTIONS 02.27.2017 40-024-5451-300 ENLARGED FOUNDATION PLAN '3.31,2 t <br /> 40-024-1A17-700 PARTIAL FIRST FLOOR PLAN 10.24.2016 40-024-S2o-700 STATEMENT OF SPECIAL INSPECTIONS 03.31.2016 40-024-5451-700 ENLARGE PLAN 1.141. c <br /> 40-024-IA17-800 PARTIAL FIRST FLOOR PLAN 08.15.2016 40-024-S2o-800 STATEMENT OF SPECIAL INSPECTIONS 08.15.2016 40-024-S452-700 ENLARGE PLAN 1.14.2:' <br /> 40-024-1A18-700 PARTIAL FIRST FLOOR PLAN 10.24.2016 40-024-S2o-801 STATEMENT OF SPECIAL INSPECTIONS 04.21.20 16 <br /> 40-024-1A18-800 PARTIAL FIRST FLOOR PLAN 08.15.2016 40-024-S500-1-700 TOOLING DETAILS 03.31.2016 <br /> 40-024-IA19-700 PARTIAL FIRST FLOOR PLAN 10.24.2016 0-024-TNS3-300 COMPOSITE TUNNEL PLAN 01.14.2016 40-024-S500-2-700 TOOLING DETAILS 09.07.2016 <br /> -024-TNS3-301 COMPOSITE TUNNEL PLAN 02.27.2017 40-024-S500-3-301 TRENCH COVER DETAILS 02.27.2017 <br /> 40-024-2A21-700 PARTIAL SECOND FLOOR PLAN 03.31.2016 40-024-S500-4-301 TOOLING DETAILS 02.27.2017 <br /> 40-024-2A22-700 PARTIAL SECOND FLOOR PLAN 03.31.2016 -024-TNSiO-14-103 TUNNEL PLAN 02.23.2017 CITY OF EVE R ETl <br /> 40-024-2A23-700 PARTAL SECOND FLOOR PLAN 03.31.2016 0-024-TNS1O-15-301 TUNNEL PLAN 02.27.2017 40-024-5502-1-700 BOOM CRANE DETAILS 10.24.2016 <br /> 0-024-TNS10-16-301 TUNNEL PLAN 0227.2017 40-024-5502-2-700 BOOM CRANE DETAILS 10.24.2016 <br /> REVIEWED 1- R PEKMF- <br /> 40-024-A212-700 WALL SECTIONS AND DETAILS 10.24.2016 40-024-S502-3-700 BOOM CRANE DETAILS 10.24.2016 <br /> 40-024-A533-700 FENCE GATE DETAIL 07.18.2016 0-024-iS3-300 COMPOSITE SLAB PLAN 10.24.2016 40-024-5502-4-700 BOOM CRANE DETAILS 10.24.2016 <br /> 40-024-A625-700 FENCE AND GUARDRAIL DETAILS 03.31.2016 40-024-1S3-301 SLAB PLAN 02.27.2017 40-024-5502-5-700 BOOM CRANE DETAILS 10.24.2016 <br /> 40-024-A627-700 MOBILE UTILITY ARCH 03.07.2016 40-024-iS3-700 _COR COMPOSITE SLAB PLAN 10.24.2016 40-024-S502-6-700 BOOM CRANE DETAILS 10.24.2016 <br /> 40-024-1S3-800 -.,--OSITE FIRST FLOOR SLAB PLAN 08.15.2016 <br /> 40-024-1S3-801 COMPOSITE 1ST FLOOR SLAB PLAN 04.21.2016 40-024-S503-1-103 TUNNEL SHORING <br /> 40-024-1560-700 PARTIAL SLAB PLAN 11.14.2016 40-024-S583-700 STRUCTURAL DETAILS 05.06. <br /> 40-024-1S60-301 SLAB PIAN 02.27.2017 40-024-S620-700 STRUCTURAL DETAILS 05.06.2' <br /> 40-024-1561-300 PARTIAL FIRST FLOOR SLAB PLAN 02.29.2016 40-034-5560-700 STRUCTURAL DETAILS 05.06.:" <br /> 40-024-1561-301 SLAB PLAN 02.27.2017 40-035-S530-700 STRUCTURAL DETAILS 05.06",. <br /> 40-024-1561-700 PARTIAL FIRST FLOOR SLAB PLAN 09.07.2016 <br /> 40-024-1562-300 PARTIAL FIRST FLOOR SLAB PLAN 02.29.2016 <br /> 40-024-1S62-700 PARTIAL FIRST FLOOR SLAB PLAN 09.07.2016 <br /> 40-024-iS62-800 PARTIAL FIRST FLOOR SLAB PLAN 08.15.2016 <br /> 40-024-1563-300 PARTIAL FIRST FLOOR SLAB PLAN 02.29.2016 <br /> 40-024-1S63-700 PARTIAL FIRST FLOOR SLAB PLAN 09.07.2016 <br /> EBRPH 17 <br /> Architects,Engineers,Constructors <br /> NCA 33NAw W.9uiY56 OMnYdpCumt6 <br /> L9ninma wrwym 910.6 <br /> HPYmW <br /> WM1lW31V�T <br /> SY9A REVISION BY ,APPROVED DATE SIM REV" BY APPROVED f'.�.. I <br /> ACCEPTABILITY KAG 02 23 17 BUBnTIE cuRr¢NT RcvmoN srueoL 1 w <br /> 1.- 'S20 THI9 DESIGN AND/OR SHEET INDEX 16921 02/23/17 <br /> 0 Issue For Constructior-Site Logistics (W8S 16921) NAG JTH 12/22/16 WCD o <br /> �..,( AIAHI]FCf SPECIFICATION 5 APPROVED 02 2J 17 SHEET <br /> 1 Benson-Release 1-Issue Fa Permi;(Snoring funnel) (16921) KAG JTH 02/23/17 //\ ""AMA V" <br /> ® ,. APPROVED Bf DEPT. DATE JTH 02/23/17 rRcnzm TmE FACTORY TRANSFORMATION - TUNNEL SHORING G2e -1 03 n <br /> i No <br /> 5=.BZI LZER -024 .�B NO. COMP NO. <br /> BUILDING 4015/2899-103 swe oe usBxnc^aN WO 15 2899-103 <br /> I(' GENERAL MASTER EVERE7, WA owc No. 40 024 G2e 103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.