GENERAL NOTES: STRUCTURAL STEEL: ADHESIVE ANCHORS: PEDESTRIAN TUNNEL LOADING CRITERIA:
<br /> 1. DESIGN,FABRICATION AND ERECTION OF ALL STRUCTURAL STEEL SHALL BE IN ACCORDANCE WITH 1. FOR POST-INSTALLED ADHESIVE ANCHORS INTO CONCRETE,PRODUCTS SHALL HAVE 1. HS2D:(4)-8KIP WHEEL LOADS
<br /> t, DESIGN IS BASED ON THE INTERNATIONAL BUILDING CODE,IBC 2015 AND THE THE AISC STEEL CONSTRUCTION MANUAL,LRFD;14TH EDITION.THE STRUCTURAL FRAME BEEN TESTED AND QUALIFIED FOR USE IN ACCORDANCE WrFH ACI355.4 AND KC-ES 2. 500 PSF APPLIED UNIFORMLY
<br /> STATE OF WASHINGTON AMENDMENTS. FABRICATOR SHALL BE AISC CERTIFIED FOR STEEL BUILDING STRUCTURES(STD)OR INCLUDE,AT AC308.PRE-APPROVED ADHESIVES INCLUDE:
<br /> 2. ALL MATERIALS AND WORKMANSHIP SHALL COMPLY WITH PROJECT DRAWINGS AND THE FABRICATORS EXPENSE,INSPECTION SERVICES NECESSARY TO INSURE THAT THE SHOP TOOLS MOVED W TUG
<br /> SPECIFICATIONS. PROCEDURES AND FABRICATION COMPLIES WITH DRAWINGS AND SPECIFICATIONS.SPECIFICALLY, A SIMPSON STRONG•TIE SET XP'(ICC-ES ESR-2508)
<br /> 3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS,CONNECTIONS,EMBED PLATE ALL WELDED CONNECTIONS SHALL BE INSPECTED AND TESTED BY A CERTIFIED TESTING AGENCY. B.HR-HY200 ADHESIVE ANCHORING SYSTEM DCC-ERS3187) 3. TME112W3000.91.10 WING UPPER PANEL TRANSPORT TOOL(LOADING PROVIDED 1/122017)
<br /> AND ANCHOR BOLT LOCATIONS FROM EQUIPMENT MANUFACTURER'S APPROVED 2 ALL STRUCTURAL STEEL SHALL HAVE THE FOLLOWING ASTM SPECIFICATION AND 2. FOR POST-INSTALLED ADHESIVE ANCHORS INTO MASONRY,PRODUCTS SHALL A 131 KIP LOADING DISTRIBUTED OVER 8 CASTERS(2 WHEELS 1'4'APART/CASTER=16 WHEELS).
<br /> DRAWINGS AND STEEL FABRICATOR'S ANCHOR BOLT AND EMBED PLATE SETTING YIELD STRENGTHS UNO: HAVE BEEN TESTED AND QUALIFIED FOR USE IN ACCORDANCE WITH ICC-ES AC58. (2)GROUP OF WHEELS.68 KIPS AND 63 KIPS,EACH GROUP HAS(4)CASTERS @ 4'-3"x ll-5'SPACING,
<br /> PLANS.WHICH HAVE BEEN APPROVED BY THE ARCHITECTIENGINEER. W&WT SHAPES------------FY=50 KSI(A992,GRADE 50) PRE-APPROVED ADHESIVES INCLUDE:(ALL MASONRY CELLS TO RECEIVE LOCATED 61'5'APART,FOR MAX WHEEL LOAD OF 8.5 KIP/WHELL
<br /> RECTANGULAR&SQUARE HSS-----FY=46 KSI(A50Q GRADE B) ANCHORS SHALL BE GROUTED SOLID) 4. TME112W40DD91-10 WING LOWER PANEL TRANSPORT TOOL(LOADING PROVIDED 11122017)
<br /> 4. THE CONTRACTOR SHALL WORK STRUCTURAL DRAWINGS TOGETHER WITH STEEL INDEX PLATES FY=50 KSI(A572) A SIMPSON STRONG-TIE-SET' CC-ES ESR-7772 A SHAME LOADING AS SHOWN ABOVE IN 3A
<br /> ARCHffECTURAL,MECHANICAL.PLUMBING,ELECTRICAL AND CML DRAWINGS TO L )
<br /> LOCATE RECESSED SLABS,SLOPES.DRAINS,EAGLES,BOLT SETTINGS.GRADES,ETC. CHANNELS.ANGLES&MISC.STEEL---FY=36 KSI(A36) B.HILTI HIT-HY 150 MAX(ICC-ES ESR-1917) 5. TME112W1000.9 REAR SPAR ASSEMBLY TRANSPORT TOOL(LOADING PROVIDED 11122017)
<br /> ANY DISCREPANCIES SHALL BE CALLED TO THE ATTENTION OF THE 3. ALL DETAILING,FABRICATION AND ERECTION SHALL CONFORM TO THE LATEST C.HILTI HIT-RE 5WSD A'93 KIP LOADING DISTRIBUTED OVER 8 CASTERS(2 WHEELS 1'3'APARTICASTER=16 WHEELS).
<br /> ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE WORK EDITION OF THE AISC STEEL CONSTRUCTION MANUAL AND THE INTERNATIONAL 3. SUBSTITUTION REQUESTS FOR PRODUCTS OTHER THAN THOSE LISTED ABOVE (2)GROUPS OF WHEELS 46.5 KIPS EACH GROUP,EACH GROUP HAS(4)CASTERS @ T-0'x 8'$°SPACING,
<br /> 5. THE STRUCTURAL INTEGRITY OF THE COMPLETED STRUCTURE DEPENDS UPON THE BUILDING CODE. MAY BE SUBMITTED BY THE CONTRACTOR TO THE ENGINEER-OF-RECORD(EOR) LOCATED 675-APART,FOR MAX WHEEL LOAD OF 5.8 KIPSNVHEEL
<br /> INTERACTION OF VARIOUS CONNECTED COMPONENTS.PROVIDE ADEQUATE BRACING, 4. ALL WELDING ELECTRODES SHALL BE E70XX,UNO.ALL WELDING SHALL BE PERFORMED FOR REVIEW.SUBSTITUTIONS WILL ONLY BE CONSIDERED FOR PRODUCTS
<br /> SHORING,AND OTHER TEMPORARY SUPPORTS AS REQUIRED TO SAFELY COMPLETE THE BY AWS CERTIFIED WELDERS AND SHALL CONFORM TO AWS DIAID1.1 M STRUCTURAL HAVING A CODE REPORT RECOGNIZING THE PRODUCT FOR THE APPROPRIATE 6• TME112W20009 FRONT SPAR ASSEMBLY TRANSPORT TOOL(LOADING PROVIDED 1/122017)
<br /> WORK WELDING CODE-STEEL.LATEST EDITION. APPLICATION,SUBSTITUTION REQUESTS SHALL INCLUDE CALCULATIONS A 95 KIP LOADING DISTRIBUTED OVER 8 CASTERS(2 WHEELS t'9'APART/CASTER=16 WHEELS).
<br /> 5. ALL FILLET WELDS SHALL BE 3/16'UNO.BUT NOT LESS THAN AISC MINIMUM, PERFORMANCE
<br /> V THE SUBSTITUTION IS THE EQUIVALENT CAPABLE OF ACHIEVING LOCATED 723'APART FOR MAX WHEEL LOAD O2)GROUPS OF WHEELS 47.5 KIPS EACH GROUP,F 5 9 K PSIWHEEL,CH GROUP HAS(4)CASTERS @ T-4'z 8'-8'SPACING,
<br /> 6. THE CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS PRIOR TO PERFORMANCE VALUES OF THE PRE-APPROVED PRODUCTS,
<br /> ORDERING ANY MATERIALS AND SHALL NOTIFY THE ARCHITECTIENGINEER IF DIFFERENT 'SEE CHART BELOW: 4. ADHESIVE ANCHORS SHALL BE INSTALLED PER THE MANUFACTURER'S 7. TME TUG:42 KIP LOADING DISTRIBUTED OVER 4 WHEELS=10.5 KIPSIWHEEL @ 6'4'xT-1"SPACING
<br /> FROM WHAT IS SHOWN ON THE DRAWINGS. MINIMUM SIZE FOR FILLET WELDS INSTRUCTIONS.THE CONTRACTOR SHALL CONTACT THE MANUFACTURER FOR (LOADING PROVIDED 11122017)
<br /> 7. THE CONTRACTOR SHALL REVIEW THESE DRAWINGS AND VISIT THE PROJECT SITE BEFORE MATERIAL THICKNESS OF THINNER MINIMUM SIZE OF PRODUCT INSTALLATION TRAINING. TOOLS MOVED W AGV
<br /> PART JOINED(INCHES) FILLET WELD(INCHES)
<br /> CONSTRUCTION BEGINS TO COMPARE ALL EXISTING CONDITIONS WITH WHAT IS SHOWN ON S. MINIMUM EMBEDMENT FOR ADHESIVE ANCHORS SHALL BE AS FOLLOWS,UNO: B. 3TME112W0000 WINGBOX LAYDOWN TRANSPORT TOOL LOADING PROVIDED 1112201
<br /> THESE DRAWINGS.IF THERE ARE CONDITIONS WHICH ARE DIFFERENT FROM WHAT IS SHOWN, TO 1/4'INCLUSIVE 118'
<br /> OVER 114"TO 12" 3118 1/2'DIA=412" 314'DIA=6 314° A (1)x243 KIP OUTBOARD BOGIE(=2 x 1.233 PLF LINE LOADS FROM CASTERS OVER 10'@ 8'-2'OC)
<br /> T03/4° 114'
<br /> THE STRUCTURAL ENGINEER OF RECORD SHALL BE NOTIFIED. 5/8'DIA=5 5/8' 1'DIA=9' S. (1)z 35.5 KIP INBOARD BOGIE(=2 x 1,731 PLF LINE LOADS FROM CASTERS OVER 19-3"@ 12S"OC)
<br /> OVER1
<br /> 8. THE CONTRACTOR SHALL ARRANGE A PRE-CONSTRUCTION MEETING WITH THE DYER 311 5116" (2)BOGIES LOCATED 46-8-APART.
<br /> ARCHITECTIENGINEER TO ENSURE THAT THE CONTRACTOR'S UNDERSTANDING OF THESE 9. 2TME112WD00D9/-10 WING ASSEMBLY PULSE FRAME(LOADING PROVIDED 11122017)
<br /> DRAWINGS AND PLAN FOR THE WORK IS IN ACCORDANCE WITH THE DESIGN INTENT AND TO 6. THE FABRICATOR SHALL FURNISH A STRUCTURAL SUBMITTAL WHICH SHALL BE CHECKED DEBRIS MITIGATION: A (i)x40.2 KIP OUTBOARD BOGIE(=2 x 1.040 PLF LINE LOADS FROM CASTERS OVER 194"@ V-10°OC)
<br /> CLARIFY ANY QUESTIONS THAT THE CONTRACTOR MAY HAVE. BY THE CONTRACTOR FOR COMPLETENESS AND CONTENT PRIOR TO SUBMITTAL TO THE B. (2)x 34.3 KIP INBOARD BOGIE @ 11-6'OC(EACH BOGIE=2 x 1,838 PLF UNE LOADS FROM CASTER OVER MITIGATION AND OUTBOARD AND INBOARD BOGIES LOCATED 67'-8'APART.
<br /> S M9'-0"@ 3-0 OC)
<br /> STRUCTURAL ENGINEER OF RECORD FOR REVIEW.THE SUBMITTAL SHOULD INCLUDE 1, CONTRACTOR SHALL COORDINATE WITH OWNER FOR DEBRIS 9. SECTIONS AND DETAILS ARE SHOWN TO INDICATE SPECIFIC CONDITIONS.WHERE SECTIONS ARE NOTED FABRICATION AND ERECTION DRAWINGS.FABRICATION SHALL NOT COMMENCE UNTIL THIS CLEAN-UP REQUIREMENTS FOR ALL CONSTRUCTION DEBRI M AFFECTING AREAS
<br /> TO BE TYPICAL,THESE SECTIONS OR DETAILS SHALL APPLY TO OTHER SIMILAR LOCATIONS.ANY REVIEW IS COMPLETED. WITHIN THE EXISTING OPERATIONAL BUILDING. 10. TME712W4000.9/-10 WING LOWER PANEL LOADER(LOADING PROVIDED 11122017)
<br /> LOCATION IN QUESTION SHALL BE BROUGHT TO THE ATTENTION OF THE STRUCTURAL ENGINEER. 7, CUTS.HOLES AND THEIR REINFORCEMENT(REQUIRED BY OTHER TRADES)SHALL BE - � A 78 KIP LOADING IS DISTRIBUTED OVER 40 CASTERS(=2 KIPS/CASTER).
<br /> t0. THE STRUCTURAL ENGINEER OF RECORD SHALL NOT BE RESPONSIBLE FOR THE MEANS,METHODS, SHOWN ON THE STRUCTURAL STEEL SHOP DRAWINGS AND SHALL BE MADE IN THE EACH PAIR OF CASTERS ARE SPACED BETWEEN V-11"TO 9'-8"APART ACROSS THE VARIOUS INBOARD
<br /> TECHNIQUES,SEQUENCES,NOR PROCEDURES OF CONSTRUCTION SELECTED BY THE SHOP.FIELD BURNING OF HOLES&CUTS IN STRUCTURAL STEEL SHALL NOT BE (ROOT END).MID-SPAN,AND OUTBOARD(TIP END),AND EACH PAIR OF THESE CASTERS ARE SPACED
<br /> CONTRACTOR OR THE SAFETY PRECAUTIONS AND PROGRAMS INCIDENTAL TO THE WORK OF THE PERMITTED EXCEPT BY WRITTEN PERMISSION FROM THE STRUCTURAL ENGINEER OF VERIFICATION O F REINFORCING I N EXISTING BETWEEN 2'-6'TO 10'-T OC ALONG THE 113'LENGTH OF THIS WING LPL.
<br /> CONTRACTOR.THE STRUCTURAL ENGINEER SHALL NOT BE RESPONSIBLE FOR THE FAILURE OF THE RECORD,UNLESS NOTED OTHERWISE ON THE DRAWINGS. PRECAST TUNNEL PANELS: 11. PME112W0000.91-10 WING RIB SPAR MODULE(LOADING PROVIDED 1/122017)
<br /> CONTRACTOR TO PERFORM THE CONSTRUCTION WORK IN ACCORDANCE WITH THESE DRAWINGS. 8. SIZE AND SHAPE OF STRUCTURAL STEEL SHALL BE AS SHOWN ON DRAWINGS. A (15)AXLE SPACED-5'TO-10'APART.OVER A TOTAL LENGTH OF 103'5"
<br /> 11. THE INTENT OF SITE VISITS ARE FOR THE STRUCTURAL ENGINEER TO BECOME FAMILIAR WITH THE 9. AFTER ERECTION,ALL STEEL SHALL BE CLEANED OF ALL RUST,LOOSE MILL,SCALE,AND 1. VERTICAL AND HORIZONTAL REINFORCING HAS BEEN CONFIRMED BOTH VIA GROUND LOADS VARY BETWEEN 3.4 TO 13A KIPIAXEL(2 TO 6 CASTERS PER AXLE=1.7 TO 2.8 KIPS/CASTER).
<br /> QUALITY OF THE CONSTRUCTION AND TO DETERMINE IN GENERAL IF THE CONSTRUCTION IS OTHER FOREIGN MATERIAL SCUFFS AND ABRASIONS SHALL BE FIELD TOUCHED-UP. PENETRATING RADAR(GPR)AND CHIPPING OUT OF PRECAST WALL TO EXPOSE 12. 3898{irr0001 E.2 FIXED BED ROBOT TRANSPORT CART(LOADING PROVIDED 11122077)
<br /> PROCEEDING IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS. 10. ALL FIELD CONNECTIONS ARE TO BE PAINTED TO MATCH ATTACHED COMPONENTS. REINFORCING TO BE AS FOLLOWS: A (1)x 40.6 KIP BOGIE=2 z 1,572 PLF LINE LOADS FROM 20 CASTERS OVER 17-11'@ 8'4°OC(2.0 KIPSICASTER).
<br /> A. 04 VERTICAL @-10'OC AT BOTH INSIDE AND OUTSIDE FACES OF PRECAST 13. TORI AUTOMATED GUIDED VEHICLE(AGV)(LOADING PROVIDED 111220t7)
<br /> 11. WELDED SHEAR STUDS SHALL BE 12'DIA z 6'LONG ASTM At08 HEADED STUDS. TUNNEL WALLS AFTER EXPOSING A SINGLE LOCATION OFA I4 VERTICAL BAR AT A (4)WHEELS @ 2 KIPS EACH ON 7-11'x 15'-T SPACING
<br /> INSIDE FACE,IT HAS BEEN CONFIRMED THAT VERTICAL REINFORCING IS
<br /> S. (4)WHEELS @ 8 KIPS EACH ON N-5'z 8'-0'SPACING
<br /> CONTINUOUS FROM BASE OF PRECAST WALL TO NEAR CROWN OF TUNNEL WALL. 1
<br /> B. Y4 HORIZONTAL @-8'OC,ALTERNATING BETWEEN INSIDE ANO OUTSIDE FACES
<br /> OF WALL.
<br /> 2. IT IS NOT ALLOWED TO CUT REINFORCING IN EXISTING PRECAST TUNNEL PANELS.
<br /> CONTRACTOR TO PERFORM GPR AT EACH LOCATION AS NECESSARY,AND/OR SHIFT
<br /> HSS5x5 BRACES LATERALLY-/.T,AND UTILIZE VERT SSL HOLES TO AVOID CUTTING /
<br /> „ REINFORCING WHEN DRILLING FOR EPDXY ANCHOR BOLTS.
<br /> LOAD TESTS OF SHORED TUNNELS:
<br /> _ 1. LOAD TESTING IS TO BE PERFORMED AFTER HSS5x5 BRACE SHORING IS INSTALLED TO
<br /> CHECK EXISTING PANELS AT SHORED AREAS.
<br /> i
<br /> I
<br /> i
<br /> CITY OF EVERET fi
<br /> RETEIINED FOR PERMIT INBRPH
<br /> t
<br /> Architects,Engineers,Constructors
<br /> imA W.9.w Snell W.urt,.--.
<br /> SYM RI:+I" 9Y P PROVED DATE SYM REH9D1: PPROVEp LATE
<br /> 0 IFC(PEDESTRIAN TUNNELx024-037} W8516927 BEL TAL 72/22/1E h ^ sueTmE cuRREUT REwsiory s SOL a.TE
<br /> SPS A- � ACCEPTA8ILIT`! BLL 02/23/17
<br /> �� DE wAs„ SPECIFICATION DESt>AND/OROVED ESE YED 02/23/17 GENERAL NOTES 5 E 11619z1 1 02
<br /> 1 Re&m-Rolm 7-Imre Fa P-ft(SfairgT mel) (16927) BEL TAL 02(23/77 ® u �< P-ROVEO Wr Dn T. DATE TAL 02/23 17 TREE FACTORY TRANSFORMATION - TUtiNEL SHORING Stn -1 03
<br /> BOE/A/G K
<br /> BUILDING 40-031 7-m No.
<br /> T �FPSEC!$TEP �" APFRO WO 15/289(
<br /> mc
<br /> ozEi STRUCTURAL MASTER - "-_ VIA 40-031-S2n-103 /
<br />
|