Laserfiche WebLink
OTTO ROSENAU& ASSOCIATES, INC. <br /> CONSTRUCTION INSPECTION FIELD REPORT <br /> i <br /> Report Number: 351895 ' <br /> Project: Boeing LRIP Wing Foundation systemsQp­� <br /> ermit Number: 81406-038 <br /> Address: Everett Boeing Plant, Bldgs.4024,4031 and JoNumber: 16-0044 <br /> 4032 ---- <br /> Client: Boeing SSG Client Address: 3600 West Casino Way Everett,WA <br /> Inspections Performed <br /> Steel Decking Welding X JOWMF...« <br /> CM13D?0i61 <br /> Structural Steel Fabrication Epoxy X oc1 EXP 711/2o+9 <br /> Structural Steel Erection <br /> Inspector John Fraser CWI <br /> and Date 5.23.2017 Remarks: LRIP/"Main Street"tunnel shoring-Welding/epoxy anchors <br /> On site for ORA at contractor's request for inspection of steel embed welding and epoxy anchor installation. This report is intended <br /> to cover the full scope of inspection for this entire phase of tunnel shoring. Inspection covers the requirements for material I.D., <br /> location, size and condition of structural members. Welding inspection covers requirements set forth in engineer's specifications and <br /> AWS D1.1,AISC 341-010 and contract docs : <br /> Welding <br /> WPS's, filler wire,preheat and other welding prbtacols are all in order. <br /> Weldors and their progress for these Embed locations: <br /> Boeing main factory,tunnels at D, E and I line funnels,as they pass under"Main Street",approximately 10.5 to 12.5 S. <br /> Fillet welding of 1/2" steel plate clips to %z" steel wall plates is in conformance for VT <br /> Fillet welding of HSS cross beams to anchored mounting plates with clip is in conformance for VT <br /> Flare bevel and fillet welding of Bracing angle to HSS cross beams is in conformance for VT t <br /> WABO Certified Welders: <br /> Ronald A.Jones W02779 10.1.2017 <br /> Danny R. Lamphier W02328 7.1.2017 <br /> -3/4"HAS galy anchors for wall plate installation using HILT[ HY20OR epoxy in the above locations is in conformance. <br /> Ref: Ref: BRPH WO 15/2889-103, sheet S503-1-103 <br /> Boeing BCAG construction management: RFI# 10859, 3/30/2017 and RFI#10860,3/31/2017 <br /> This section of steel conforms to AISC and construction drawings. <br /> Reference original ORA report numbers for: John Fraser-350626,350635,350640,351868 <br /> Matthew Hancock-351166,351168,351195,351196 <br /> Conforms: X Does Not Conform: Work in Progress: <br /> Inspected by: ,Z_ Reviewed by: <br /> This report applies only to the items tested or reported and is the exclusive property of Otto Rosenau&Associates, Inc. Reproduction of this report, <br /> except in full,without written permission from our firm is strictly prohibited. <br /> Page 1 of 1 <br /> 6747 M.L. King Way S., Seattle,Washington 98118—Phone(206)725-4600 or 1-888-OTTO-4-US—Fax(206)723-2221 <br /> Form No.:/NSP-63a-06 LT(Rev 01/13) ;' <br />