INFORMATION FOR THE DEVELOPER <br /> Planning Department comments: <br /> 1. If a complete application has not been filed for a building permit or equivalent construction <br /> permit within eighteen (18) months from the approval date of this decision, the permit shall <br /> be deemed terminated, unless an extension is granted. If the permittee requests an extension <br /> in writing not later than eighteen(18)months from the land use permit date,the Director may <br /> grant a six(6) month extension. <br /> 2. This is an administrative decision that may be appealed to the City's Land Use Hearing <br /> Examiner. An appeal must be filed with the City within 14 days of the date of this notice. If <br /> you have questions regarding this proposal or if you wish to file an appeal, please contact <br /> Teresa Weldon, City of Everett Planning Department, at 425.257.8731. <br /> Public Works Department comments: <br /> 1. A Public Works Permit is required for this project. Detailed drawings in accordance with City <br /> Design and Construction Standards shall be submitted to the Public Works Department, <br /> showing site plan layout, utilities, storm drainage, temporary construction erosion control, <br /> and all required improvements in the public right-of-way. Public Works Department approval <br /> of these drawings is required prior to any permits being issued. All improvements shall be <br /> completed, approved, and warranted before the Occupancy Permit is issued/final approval is <br /> granted. <br /> 2. Garage door shall be at least five-feet from the property line. <br /> 3. Roof runoff from the garage shall not be tight-lined to the combined sanitary sewer system, <br /> but shall instead be infiltrated and/or dispersed into existing vegetation on the lot. <br /> 4. Any grading/fill on this site shall be done so as to not impact the surrounding properties. <br /> 5. Approval of construction plans will require demonstration that all pertinent standards and <br /> regulations are met. <br /> 6. City streets and alleys are to be kept clear of dirt and debris at all times during construction. <br /> Dust suppression and street cleaning must occur as directed by the Public Works Inspector. <br /> 7. Lack of comment on the plans submitted with the application does not constitute approval of <br /> these plans. <br /> 8. Temporary erosion control measures for construction activity must be operational prior to <br /> commencement of any clearing or earthwork. <br /> REV If 15-021 <br />