Laserfiche WebLink
PUBLIC WORKS PERMITDate: 5/26/2010 <br /> Public Orks Permit#: PW1005-021 <br /> City of Everett Public Works Department <br /> y <br /> 3200 Cedar Street Buildinq Permit#; C1005-016 <br /> Everett, WA 98201 Planninq Reference#: <br /> (425) 257-8810 <br /> Public Works Fee $: $ 25.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> MUELLER PETER <br /> 18318 125TH AVE NE#612 <br /> BOTHELL WA 98011 <br /> PHONE: PHONE: <br /> TAX PARCEL ID# 00385417601100 SITE ADDRESS: 923 COLBY AVE <br /> DESCRIPTION OF PROPOSED WORK: <br /> HOUSE ADDITION <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Connect all rooftop downspouts to the side sewer. <br /> 5. The contractor must meet with the Public Works Inspector(call Randy Allen at 425-339-7403) to discuss potential w <br /> drainage routing prior to beginning the project. <br /> 6. Install erosion control measures as determined by the Public Works inspector, such as silt fence,straw bales, <br /> swales, or erosion blankets. <br /> 7. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br /> 8. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, permitted site. <br /> No wasting of material is allowed on this building lot. <br /> 9. No dirt, mud, rocks or debris to be tracked onto roadway. Z <br /> 10. No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and open for O <br /> pedestrian travel. !• <br /> CTI C -P'..r'-J Vl <br /> _ r_,.a <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages, costs, expenses, or causes of action that may arise <br /> because of installation and maintenance of the improvement <br /> �h or other right-of-way use hereto applied for and further agrees <br /> to remo a same upon notice from the City and to replace <br /> Appr ved for Construction Dat public p pe damaged thereby. <br /> FINAL INSPECTION Date <br /> Approved as Constructed Sig t6 Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT I ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />