Laserfiche WebLink
INSPECTION REPORT <br /> Date: 1-5— Permit: E no <br /> Contractor: MAI) <br /> � <br /> Owner: <br /> Site Address:_q 23 Col <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑ Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑ Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> O OR .O. ❑ VIOLATION <br /> �IQAB TO PERFORM INSPECTION: <br /> _ (425)257_8881FOREINSPECT0N-24 hour notice required <br /> C�« Y21 - 2 5:7- 2RF<a 7-WV-4,e <br /> o <br /> A.; <br /> Inspector:��� Date: <br /> EIR(4/09) a_;nni� nanxsre,,. 1111)111.421/488-89110 <br />