My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
923 COLBY AVE 2017-08-17
>
Address Records
>
COLBY AVE
>
923
>
923 COLBY AVE 2017-08-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2017 10:55:50 AM
Creation date
8/17/2017 10:55:38 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
923
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1/92013 City of Everett Page 1 <br /> 11:32:10AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1005-016 Site Address 923 COLBY AVE <br /> Applied 5/25/2010_ Applicant Lot <br /> Approved 7/2/2010 Owner MUELLER PETER Block <br /> Issued 7/6/2010 Contractor GRONDAHL CONST LLC Tract <br /> Parent Permit No. Description HOUSE ADDITION <br /> Notes 2006 IRC,WSEC&WSVIAQC <br /> MATERIALS TO MATCH SIMILARLY AS EXISTING <br /> Scheduled ComDleted TvDe Inspector Result Remarks Inspector's Comments <br /> 7/9/2010 7/9/2010 Footing MWH Approval <br /> 7/9/2010 7/9/2010 Foundation MWH Approval <br /> 7/19/2010 7/19/2010 PlbgGrWork SDP Approval As per notes 1. Backwater valve is not required by code- <br /> upstream manhole 122.86'basement floor <br /> 132 <br /> 2. Groundwork ok <br /> 9/22/2010 9/22/2010 Framing MWH Approval As per notes Note: Cascade Testing to witness epoxy <br /> bolting <br /> Ok hold-down installations at foundation <br /> 10/18/2010 10/18/2010 PlbgRoughIn DXW Approval <br /> 10/20/2010 10/20/2010 ShearNailing MWH Approval Note:add straps as <br /> discussed <br /> 10/26/2010 10/26/2010 Framing MWH PartialApproval 1st Floor& <br /> Basement <br /> 10/27/2010 10/27/2010 InsulBldg MWH Corr Reqd See notes Insulation NOT approved-Engineering <br /> letter on fix for location and size of holes in <br /> joists NOT approved <br /> Corrections-Submit Plan showing: <br /> 1.size of joists <br /> 2. 5 pans <br /> 3. Location and size of holes for Building <br /> Department approval <br /> 10/29/2010 InsulBldg MWH <br /> 11/3/2010 11/3/2010 DrywaIINailing MWH Approval <br /> 7/26/2011 Letter MEM Approval Extend to 12-26-11 <br /> 1/23/2012 Consultation MWH See notes Permit was extended until 12-26-11 <br /> Send final letter 1 more time <br /> 4/27/2012 4/27/2012 Counter Visit JLP Approval Permit Extended-see Owner came in with extension request-see <br /> notes letter in file <br /> Permit will be extended to 10/24/2012- <br /> advised owner of date and advised if <br /> remains in"no progress"status additional <br /> fees and or submittals may be required <br /> 9/18/2012 9/18/2012 MechRoughIn SDP PartialApproval See notes As noted: <br /> 1.Mechanical inspections were not <br /> performed before cover.Went over <br /> methods/materials with owner. <br /> 2.Question:What size and materials were <br /> used on the stove exaust <br /> 9/18/2012 9/18/2012 P1bgRoughIn SDP PartialApproval See notes As noted: <br /> 1.Rough in plumbing upstairs complete <br /> 10/29/2012 StatusReview MWH See notes Please call for final inspections on all <br /> permits. <br /> INSP12 ` —' <br />
The URL can be used to link to this page
Your browser does not support the video tag.