Laserfiche WebLink
Page 2 <br /> 7/26/201:5 City of Everett <br /> 9:23:52AM <br /> INSPECTION ACTIVITY REPORT <br /> 8/5/2013 8/5/2013 Final Bldg BSM Corr Reqd See notes Install fireblocking at the ceiling line <br /> between the 2nd floor bathroom and great <br /> room <br /> Seal all plate penetrations with <br /> non-combustable material <br /> OK to insulate the above listed items,will <br /> be inspected at the time of the insulation <br /> inspection <br /> 10/25/2013 InsulBldg ICMK Unable to inspect, <br /> No access 10:45am <br /> 10/28/2013 10/28/2013 MechRoughIn SDP Approval See notes Please send manufacturer's specs for stove <br /> exhaust to Shelliea <br /> 10/28/2013 10/28/2013 P1bgRoughIn SDP Approval <br /> 10/28/2013 10/28/2013 InsulBldg KMK Approval OK to cover <br /> 8/7/2014 8/7/2014 DrywallNailing KMK Approval OK to mud&tape <br /> 7/27/2015 Letter MEM Expiring,respond <br /> 8-31-15,no ext offer <br /> 7/26/2015 City of Everett Page 1 <br /> 8:00:46AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E1008-159 Site Address 923 COLBY AVE <br /> Applied 8/26/2010 Applicant Lot <br /> Approved Owner MUELLERPETER Block <br /> Issued 8/26/2010 Contractor OWNER Tract <br /> Parent Permit No. C1005-016 Description WIRE HOUSE ADDITION <br /> Notes 2006 IRC,WSEC&WSVIAQC <br /> MATERIALS TO MATCH SIMILARLY AS EXISTING <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 10/12/2010 10/12/2010 ElecService DHN Approval OK service,call <br /> PUD <br /> 10/12/2010 10/12/2010 ElecRoughIn DHN Approval OK rough in back <br /> addition <br /> 10/12/2010 10/12/2010 ElecGrdWork DHN Approval See notes OK groundwork conduit to pole-riser to <br /> meterbase to be plumb. <br /> 10/25/2010 10/25/2010 Final Elec DHN Corr Reqd See notes Correction: <br /> 1. Not allowed to cut strands off wire to fit <br /> lugs-use proper size lugs or upsize panel <br /> 10/29/2010 10/29/2010 ElecRoughIn DHN PartialApproval OK refeed existing <br /> svc panel,call PUD <br /> 4/27/2012 4/27/2012 Counter Visit JLP Approval Permit extended-see Owner came in with extension request see <br /> notes letter in file. <br /> Permit will be extended to 10/24/2012- <br /> advised owner of date and advised if <br /> remains in"no progress"status additional <br /> fees and or submittals may be required <br /> 1/15/2013 Letter MEM Expiring,respond by <br /> 2-14-13 <br /> 2/19/2013 2/19/2013 Letter TKJ Permit extended Rcvd email from owner to extend permit <br /> Permit stalled due to unemployment. <br /> 8/2/2013 8/2/2013 ElecRoughIn TRA Approval OK rough electrical <br /> upstairs <br />