Laserfiche WebLink
• 6 <br /> SEG 05-25-2010(TUE) 09:58 <br /> G.B. 012111,157 <br /> ,z <br /> 1, 1 <br /> 'h PL:.Rl'111 No.1005016 <br /> 7 <br /> pq $787.130t <br /> TL <br /> Ev Err _ <br /> 87.90 <br /> (425)257-8810 CHECK $787.90 <br /> Plan Check No.: C1005-016 <br /> Application Date: 5/25/2010 <br /> Tenant: <br /> Owner: MUELLER PETER <br /> Job Address: 923 COLBY AVE <br /> Proposed Use: SFR <br /> Description of Work: HOUSE ADDITION <br /> Plan Check Fee Paid: $787.9 <br /> The building permit application for the above-referenced project is being conditionally accepted for filing <br /> pending the determination of its completeness. <br /> If the City review determines that any additional land use approval or any additional information is <br /> required to complete your building permit application, it will be necessary to submit this additional <br /> information or acquire the additional land use approval prior to your application being considered complete <br /> for filing. If no other land use approval or additional information is required,your building permit <br /> application will be considered filed as of this date. <br /> BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br /> WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br /> S 2-s r D <br /> Si at Dat <br /> FILE COPY <br />