My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/10/21 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/10/21 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 4:31:42 PM
Creation date
10/28/2015 3:10:52 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/21/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. <br />AN ORDINANCE creating a special improvement project entitled, <br />"Everett Mall Way - 4th Ave to East Mall Drive Intersection <br />Safety," Fund 303, Program 106, to accumulate all costs for the <br />improvement. <br />WHEREAS, the City of Everett is committed to a planned traffic intersection safety program; <br />and <br />WHEREAS, the City of Everett has identified the need and obtained funds to construct certain <br />traffic intersection safety improvements; and <br />NOW, THEREFORE, THE CITE' OF EVERETT DOES ORDAIN: <br />Section 1: <br />A special improvement project is hereby established as Fund 303, Program 106, entitled <br />"Everett Mall Way - 4th Ave to East Mall Drive Intersection Safety," to accumulate all costs for <br />the improvement. <br />Section 2: <br />Authorization is hereby given to accumulate costs and distribute payments from Fund 303, <br />Program 106, for the improvement project. <br />Section 3: <br />Authorization is hereby granted for the "Public Works Directors' or "City Engineer," under <br />direction of the Mayor, to assume full and complete responsibility for conducting all tasks and <br />doing all things to accomplish the actions authorized in this ordinance. <br />Section 4: <br />The sum of $548,452 is hereby appropriated to Fund 303, Program 106, "Everett Mall Way - <br />4th Ave to East Mall Drive Intersection Safety," as follows: <br />A. Estimated Project Costs <br />Design and Construction. $ 548,452 <br />Total Estimated Cost <br />!J <br />S 548.45 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.