I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> to the extent the City caused the Delay to extend longer than if the Contractor <br /> I had solely caused the Delay. <br /> 1-09.11A(3)D Third Party Caused Delays and Force Majeure <br /> 1-09.11A(3)D1 Caused Solely by Third Parties or Force Majeure <br /> 1 1-09.11A(3)D1a Adjustment of Contract Sum <br /> The City and the Contractor shall not be responsible to compensate each <br /> I other financially for any Delay solely caused by a third party for whom <br /> neither the Contractor nor the City is responsible, or for any Delay <br /> caused solely by earthquake, flood, natural disasters, acts of war or acts <br /> of terrorism. A Delay caused by a utility's failure to provide service or <br /> I relocate its lines (despite a timely request for such service or relocation) <br /> is an example of this kind of Delay for which neither the Contractor nor <br /> the City is financially responsible to the other. Mislocated utility lines or <br /> I utility lines not located are another example of a Delay for which neither <br /> the Contractor nor the City is responsible to the other. However, the <br /> Contractor's failure to request a utility locate or relocation in a timely way <br /> I is not, and any resulting Delay would be the responsibility of the <br /> Contractor. Because the Contractor is responsible for ordering materials <br /> and Equipment, Contractor shall not be entitled to an adjustment of <br /> I Contract Time or Contract Sum due to Delays caused by the lack of <br /> materials or Equipment. A strike, job action, slowdown, work to rule, or <br /> other job action or labor dispute or problem is not a Delay caused by a <br /> third party. <br /> I1-09.11A(3)D1b Adjustment of Contract Time <br /> The Contractor shall be entitled to an extension of Contract Time for <br /> I Delays caused solely by a third party for whom neither the Contractor nor <br /> the City is responsible, or for any Delay caused solely by earthquake, <br /> flood, natural disasters, acts of war or acts of terrorism. Extension of <br /> I Contract Time shall be determined pursuant to 1-08.8 EXTENSIONS OF <br /> TIME. <br /> 1-09.11A(3)E Delays Caused Concurrently by Third Parties and Contractor <br /> I or City <br /> If a Delay is caused concurrently by (a) a third party, earthquake, flood, natural <br /> disasters, acts of war or acts of terrorism and (b) either the Contractor or the City, <br /> I then the Contractor or City is only responsible for the amount of Delay it caused in <br /> excess of the Delay caused by the a third party, earthquake, flood, natural <br /> disasters, acts of war or acts of terrorism. <br /> I 1-09.11A(3)E1 Adjustment of Contract Sum <br /> The Contractor shall be entitled to an adjustment of Contract Sum for any <br /> Delay concurrently caused by a third party and the City, but only to the extent <br /> I Contractor clearly and convincingly demonstrates that the City caused the <br /> Delay to be longer than it would have been had it been caused solely by the <br /> third party. <br /> I 1-09.11A(3)E2 Adjustment of Contract Time <br /> The Contractor shall be entitled to an adjustment of Contract Time for any <br /> Delay concurrently caused by a third party and the City, but only to the extent <br /> I Contractor clearly and convincingly demonstrates that the City caused the <br /> Sewer Regulators R4 and Division 1 -GENERAL REQUIREMENTS May 2017 <br /> R39 Modifications <br /> IWO No-UP3633 SP-123 <br />