ICITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> DIVISION 4 - BASES <br /> 1 4-04 BALLAST AND CRUSHED SURFACING <br /> 4-04.1 Description <br /> IDelete the second paragraph of 4-04.1 and substitute the following: <br /> Work shall also consist of placing crushed surfacing stone as driveway maintenance <br /> I <br /> material and in gravel driveway restoration as shown on the Plans or directed by the <br /> Engineer. The quantity shown in the Proposal is an estimate for the purpose of <br /> establishing a unit price only. Actual quantities will be measured as construction <br /> progresses. The Engineer may require that some or all of the crushed surfacing be <br /> I removed because of contamination or to meet final grades. Removal shall be included <br /> with work for"Crushed Surfacing Top Course" or"Crushed Surfacing Base Course." <br /> 4-04.3 Construction Requirements <br /> ISupplement 4-04.3 by adding the following: <br /> 4-04.3(12) Gravel Driveway Restoration <br /> I (******) <br /> Replace existing gravel driveways removed in order to allow construction of the new <br /> improvements as follows: <br /> I Restore gravel driveways by placing a minimum of 3-inches of "Crushed Surfacing <br /> Base Course" on subgrade compacted to 95 percent standard density in accordance <br /> with 2-03.3(14)D. <br /> I Preparation and compaction of the subgrade shall be included in "Crushed Surfacing <br /> Base Course" with no direct compensation made. <br /> 4-04.3(13) Gravel Driveway Maintenance <br /> I (*** ) <br /> Maintain existing driveway access by providing and placing Crushed Surfacing Base <br /> Course as necessary and directed by Engineer to allow continued access until <br /> I completion of final gravel drive restoration. <br /> 4-04.4 Measurement <br /> Delete 4-04.4 and substitute the following: <br /> IBid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 1 4-04.5 Payment <br /> Delete all paragraphs in 4-04.5 and substitute the following: <br /> I Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 1 Add the following section: <br /> 4-06 ASPHALT TREATED BASE <br /> I 4-06.3(0) General <br /> Do NOT construct the asphalt treated base course until all underground utilities are <br /> completed and inspected and approved by the Engineer. <br /> I Asphalt treated base may be placed for providing temporary access to adjoining <br /> properties where directed by the Engineer. <br /> Sewer Regulators R4 and Division 4—BASES May 2017 <br /> I R39 Modifications <br /> WO No—UP3633 SP-145 <br />