Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> ' • Drawings showing the principal dimensions, general construction and materials <br /> used in the gate and lift mechanism. <br /> • Manufacturer's operation and maintenance manuals. <br /> • Manufacturer's warranty <br /> • Design calculations in compliance with AWWA standards. <br /> ' Performance <br /> Leakage: Slide gates shall be substantially watertight under the design head <br /> conditions. Under the design seating head, the leakage shall not exceed 0.10 US <br /> ' gallons per minute per foot of seating perimeter. Under the design unseating head, <br /> leakage shall not exceed 0.10 US gallons per minute per foot of perimeter. <br /> 7-06.4 Measurement <br /> ' Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1- <br /> 09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-06.5 Payment <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1- <br /> 1 09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS <br /> ' 7-08.2 Materials <br /> Delete material items listed in 7-08.2 and substitute the following: <br /> Provide materials meeting the following requirements: <br /> ' Foundation Material Class A or B 9-03.17 Standard Specifications <br /> Gravel Borrow 9-03.14(1) Standard Specifications <br /> Controlled Density Fill 2-09.3(1)E Special Provisions <br /> Crushed Surfacing Base Course 9-03.9(3) Standard Specifications <br /> 7-08.3 Construction Requirements <br /> ' 7-08.3(1) Excavation and Preparation of Trench <br /> 7-08.3(1)A Trenches <br /> Revise the second paragraph in 7-08.3(1)A and to read as follows: <br /> Excavate trench in accordance with COE Standard Drawing No 614. <br /> Delete the second sentence in the third paragraph in 7-08.3(1)A and substitute the <br /> following: <br /> Contractor may excavate above the top of the pipe zone only as wide as <br /> necessary to meet OSHA requirements. <br /> 7-08.3(1)C Bedding the Pipe <br /> Delete the second and third paragraphs in 7-08.3(1)C and substitute the following: <br /> Provide pipe zone bedding in accordance with COE Standard Drawing 615 <br /> and 620. <br /> If the Engineer determines the material existing in the trench bottom is <br /> satisfactory for bedding the pipe, then the bedding material specified in the <br /> COE Standard Drawing 615 is not required, provided the existing material is <br /> loosened, regraded, and compacted to form a dense, unyielding base. <br /> Supplement 7-08.3(1) by adding the following: <br /> Sewer Regulators R4 and Division 7—STORM, SEWER,WATER May 2017 <br /> ' R39 Modifications <br /> WO No.—UP3633 SP-159 <br />