Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> I DIVISION P - PROPOSAL <br /> CITY OF EVERETT,WASHINGTON <br /> I <br /> SEWER REGULATORS R4 AND R39 MODIFICATIONS <br /> WORK ORDER# UP3633 <br /> 1 To the City Council <br /> Everett,Washington <br /> I <br /> The undersigned Bidder declares that he has carefully examined the Plans and Specifications, <br /> INotice to Contractors, Standard Specifications, Special Provisions, Appendix, Proposal, and <br /> Contract for the construction of approximately 200 linear feet of 6-inch water main, and <br /> approximately 90 linear feet of combined sewer main up to 48-inch diameter,modifications to an <br /> I existing combined sewer regulator R39,construction of a new combined sewer regulator R4, and <br /> other such appurtenances and performing all Work as required by the Contract, in accordance <br /> with the Contract Plans and Contract Provisions.. The undersigned declares that he has made <br /> such investigations as are necessary to determine the conditions to be encountered, and that, if <br /> Ithis Proposal is accepted, he will enter into a contract with the City of Everett, Washington, in <br /> the form of Contract hereto annexed, he will, to the extent required, provide the necessary <br /> equipment, tools, apparatus, and other means of construction, and he will furnish all labor and <br /> I materials necessary to complete the Work in the manner herein specified and according to the <br /> requirements of the Engineer. <br /> The undersigned Bidder certifies that this Proposal is in all respects fair and is made without <br /> I collusion on the part of any person, firm or corporation mentioned below, and no officer or <br /> employee of the City of Everett is personally or financially interested, directly or indirectly, in <br /> the Proposal or in any purchase of or sale of any materials or supplies for the Work to which it <br /> Irelates, or any portion of the profits thereof. <br /> The undersigned Bidder agrees that he will complete the Work in all respects as required by <br /> Division C, Article 2. Time for Completion and that he will pay liquidated damages to the <br /> ICity in the amount specified in the Contract. <br /> Accompanying this Proposal is a bid bond or certified check in the amount of five percent (5%) <br /> I of the Proposal according to the conditions of the "Notice to Contractors" and "Division 1 - <br /> General Requirements" hereby attached. If this Proposal shall be accepted by the City of <br /> Everett, Washington, and the undersigned shall fail to execute a satisfactory contract and bond, <br /> as stated in the Division 1 —General Requirements hereto attached, within 14 calendar days after <br /> I <br /> the Award Date, then the City may, at its option, determine that the undersigned has abandoned <br /> the Contract and thereupon this Contract shall be null and void and the amount of the bid bond or <br /> certified check accompanying this Proposal shall be forfeited and become the property of the <br /> I <br /> City of Everett,Washington. <br /> I <br /> I <br /> I Sewer Regulators R4 and Division P—PROPOSAL May 2017 <br /> R39 Modifications <br /> Work Order No.—UP3633 SP-17 <br /> IIovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />