Laserfiche WebLink
ICITY OF EVERETT SPECIAL PROVISIONS <br /> ISUBCONTRACTORS FORM <br /> I 1. For heating, ventilation, air conditioning, plumbing (as defined by RCW Chap. 18.106) <br /> and electrical work (as defined by RCW Chap. 19.28), Bidder MUST either identify itself <br /> or Subcontractors in the chart below. If Bidder believes such work is not part of the <br /> scope of Work,Bidder shall write"NO WORK". <br /> I <br /> 2. Bidder shall not list more than one Subcontractor for each category of work identified, <br /> unless Subcontractors vary with bid alternates, in which case the Bidder must indicate <br /> which Subcontractor will be used for which alternate. <br /> I 3. Bidder's bid shall be deemed nonresponsive and void if: <br /> A. For heating, ventilation, air conditioning, plumbing and electrical work, Bidder <br /> fails (1) to submit as part of the Bid the names of such Subcontractors, (2) to <br /> I name itself to perform such Work,or(3) to write "No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same work. <br /> 4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, <br /> I plumbing, and electrical subcontractors applies only to proposed heating, ventilation and <br /> air conditioning, plumbing, and electrical subcontractors who will contract directly with <br /> the general contractor submitting the Bid to the City. <br /> IType/Scope of Work Name and Address of <br /> Subcontractor/Or Bidder <br /> I HEATING <br /> Subcontractor,bidder or"no work"MUST be No Work <br /> ' stated <br /> I VENTILATION AND AIR CONDITIONING <br /> Subcontractor,bidder or"no work"MUST be No Work <br /> stated <br /> PLUMBING(as described in RCW Chap. 18.106) <br /> I <br /> Subcontractor,bidder or"no work"MUST be No Work <br /> stated <br /> ELECTRICAL(as described in RCW Chap. <br /> I 19.28) Faber Construction <br /> Subcontractor, bidder or "no work" MUST be 2"SCH80 Conduit&Junction Box <br /> stated <br /> I <br /> I <br /> z. <br /> I <br /> I <br /> I <br /> I Sewer Regulators R4 and Division P —PROPOSAL May 2017 <br /> R39 Modifications <br /> Work Order No.—UP3633 SP-23 <br /> 111 ovided <br /> to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Seal <br />