My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICITY OF EVERETT SPECIAL PROVISIONS <br /> ICITY OF EVERETT <br /> I <br /> DISADVANTAGED/WOMEN'S BUSINESS ENTERPRISE <br /> IAlthough a set percentage of DBE's and WBE's subcontracts is not required in the performance <br /> of the Work under this Contract, in the event that Subcontractors will be used in the erfomance <br /> I of this Contract, Bidder is required to solicit bids from DBE and WBE subcontractors as a <br /> condition to qualify for award of Contract. Failure to solicit subcontract bids from DBE or <br /> WBE subcontractors and list on this form shall disqualify a contract Bidder from <br /> Iconsideration from contract award. During contract performance, or in any event prior to <br /> final payment, Bidder shall provide the City with the names and addresses of all DBE and WBE <br /> subcontractors actually awarded subcontracts and performing Work under the Contract. In the <br /> event that a subcontract bid is solicited and listed below and a subcontract is not awarded to the <br /> I DBE/WBE so listed, Contractor shall state the reasons such subcontract was not awarded to the <br /> DBR/WBE and shall state the DBE/WBE quote together with the actual subcontract price paid <br /> and the name of the Subcontractor to whom the Work was subsequently awarded. <br /> I I. List all DBE and WBE subcontractors and suppliers from which bids or quotes for Work <br /> on this Project have been solicited: <br /> I Name of Firm <br /> Involved Address Work <br /> 25210 45th Place South, Kent, WA 98032 Asphalt Paving <br /> Al Asphalt Paving Inc. <br /> Hot Mix Pavers Inc. 4400 South 131st Place, Tukwila, WA 98168 Asphalt Paving <br /> Belarde Company Inc. 20011 87th Ave SE, Snohomish, WA 98296 Concrete Paving <br /> Salinas Construction Inc. 7804 40th Ave West, Mukilteo, WA 98275 Concrete Paving <br /> Salinas Sawing & Sealing Inc. 7804 40th Ave West, Mukilteo, WA 98275 Saw Cutting <br /> Guyline Construction Company Inc. 205 Lila Lane, Burlington, WA 98233 Fencing <br /> I <br /> Land Development Consultants Inc. 20210 142nd Ave NE, Woodinville, WA 98072 Surveying <br /> Signature Surveying & Mapping PLLC 15541 26th Ave NE, Seattle, WA 98155 Surveying <br /> Lopez Valley Nursery & Landscaping 10624 Collins Rd, Sedro Woolley, WA 98284 Landscaping <br /> I <br /> Out West Landscape & Irrigation Inc. 25619 Florence Acres Rd, Monroe, WA 98272 Landscaping <br /> II. Please estimate the percentage of Work that will be subcontracted to DBE's and WBE's <br /> Isubcontractor and/or suppliers: 3`70 <br /> III. Please estimate the percentage of your force on this Project that will be made up of <br /> I <br /> minority group members: D "10 <br /> I I CERTIFY THAT THE ABOVE- IS TRUE AND COMPLETE TO THE BEST OF MY <br /> KNOWLEDGE A► 4 BELIEF AND AGREE TO PROVIDE ALL ABOVE INFORMATION <br /> REQUESTED B T'E CI REGARDING DBE/WBE SUBCONTRACT WORK. <br /> I Signature: J <br /> Date: (.,i a"1 PD/?"" <br /> I <br /> ISewer Regulators R4 and Division P—PROPOSAL May 2017 <br /> R39 Modifications <br /> Work Order No.—UP3633 SP-25 <br /> `ovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.