My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> In addition to compliance with Federal Acquisition Regulations, Subpart 31.2 examples <br /> of specific costs not allowed in a calculation under this Section of the Contract are <br /> Incentive Compensation paid to personnel classified as Overhead and otherwise <br /> includable under this Section of the Contract, travel and business meetings, employer <br /> paid benefits and taxes on direct payroll costs of any project, insurance costs directly <br /> identifiable to any specific project, penalties, and any costs incurred regarding <br /> company owned equipment normally classified as a direct project costs,. <br /> Owner: The City of Everett, Washington. "Owner" the "City" and "Contracting <br /> Agency" mean the same. <br /> Owner's Representative: The person designated in writing by the City to act as its <br /> representative at the construction site and to perform construction inspection service <br /> and administrative functions relating to this Contract. The terms "Engineer", <br /> "Architect", or "City's Representative" shall be interchangeable with Owner's <br /> Representative. <br /> Person: Includes individuals, associations, firms, companies, corporations, <br /> partnerships, and joint ventures. <br /> Project: The undertaking to be performed under the provisions of the Contract. <br /> Provide: Furnish and Install, complete in place. <br /> Punch List: List of incomplete items of Work and of items of Work that do not conform <br /> ' to the requirements of the Contract Documents. The Punch List is prepared after <br /> Substantial Completion. <br /> RCW: Means the Revised Code of Washington <br /> Schedule of Values: Allocation of Contract Sum to items of Work as described in 1- <br /> 09.9 PAYMENTS of these Special Provisions. <br /> Shall: Required conduct. <br /> Shown: Refers to information presented on the Plans, with or without reference to the <br /> Plans. <br /> 1 Specifications: Includes 2016 WSDOT/APWA Standard Specifications and latest <br /> Amendments, and all other specifications (including these Special Provisions) for the <br /> prescribed Work in this Contract. (This definition replaces the definition in WSDOT 1- <br /> 01.3 for Specifications.) <br /> Specify: Refers to information described, shown, noted or presented in any manner in <br /> the Contract. <br /> Submittals: The information required by the Contract Documents provided by <br /> Contractor to the City's Representative or City. <br /> Total Float: The amount of time a given activity or path of activities may be delayed <br /> before it will affect the Completion Date. <br /> Traffic: Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, <br /> wheelchairs, and equestrian traffic. <br /> ' Unabsorbed Overhead: The reduction or loss of contribution to recovery of the <br /> Contractor's Overhead costs realized by the result of reduced Project or Contractor <br /> billings, or both, due to any reason whatsoever, including a Project extension. <br /> IUnit Price Work: Refers to items of Work identified by unit prices in the Proposal. <br /> Sewer Regulators R4 and Division 1 -GENERAL REQUIREMENTS May 2017 <br /> R39 Modifications <br /> WO No-UP3633 SP-45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.