My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> Supplement 1-02.4(1) by adding the following: <br /> I Bidder acknowledges that he/she has not relied on representation or warranty of <br /> the City not expressly included in the Contract Documents. <br /> The information provided by the City is not intended to be a substitute for, or a <br /> I supplement to, the independent verification by the Bidder to the extent such <br /> independent investigation of the Drawings and Specifications or Site conditions is <br /> deemed necessary or desirable by the Bidder. Bidder acknowledges that they <br /> I have not relied upon City or Engineer furnished information regarding site <br /> conditions in preparing and submitting a Bid. <br /> Further supplement 1-02.4(1) by adding the following: <br /> 1-02.4(1)A Interpretation of Contract Documents <br /> (******) <br /> I Should a Bidder find what is believed to be discrepancies in or omissions from the <br /> Plans, Specifications, or Special Provisions, or should the Bidder be in doubt as to <br /> their meaning, Bidder may submit to the Engineer a written request for an <br /> interpretation thereof. The Bidder submitting the request will be responsible for its <br /> I prompt delivery. Any interpretation of the documents, if made, will be made only <br /> by addendum duly issued and a copy of such addendum will be mailed or <br /> delivered to each Bidder receiving a set of such documents. All requests for <br /> I interpretations must be received by the City or Engineer no later than 7 <br /> calendar days prior to the Proposal opening date. All questions regarding the <br /> Contract Documents shall be referred to the City or Engineer at the address <br /> I provided in the Contract Documents. <br /> 1-02.4(1)B Prevailing Wages <br /> (******) <br /> I Bidder is directed to 1-07.9(1) of these Special Provisions for requirements <br /> regarding applying payment of prevailing wage rates for employment of labor on <br /> within Snohomish County. <br /> I 1-02.4(2) Subsurface Information <br /> Delete the first paragraph and substitute the following: <br /> If the City has made subsurface investigation of the site of the proposed Work, the <br /> I boring log data and soil sample test data accumulated by the City will be made <br /> available for inspection by the Bidders. The boring logs and soil sample test data <br /> shall NOT be considered as part of the Contract. In addition, the City makes no <br /> I representation or warranty expressed or implied that: <br /> 1. The Bidders' interpretations from the boring logs are correct, <br /> 2. Moisture conditions and indicated water tables will not vary from those <br /> Ifound at the time the borings were made, and <br /> 3. The ground at the location of the borings has not been physically <br /> disturbed or altered after the boring was made. <br /> ISupplement 1-02.4(2) by adding the following: <br /> The geotechnical report can be found in Appendix A. <br /> I <br /> 1 Sewer Regulators R4 and Division 1 -GENERAL REQUIREMENTS May 2017 <br /> R39 Modifications <br /> iWO No-UP3633 SP-47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.