My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> 2. The City receives the request before the time set for receipt of Proposals. <br /> The original physical Bid Proposal may be supplemented, or revised and resubmitted I <br /> as the official Bid Proposal if the City receives it before the time set for receipt of <br /> Proposals. Email, fax or telephone requests to withdraw, revise, or supplement a <br /> Proposal are not acceptable. <br /> Resubmitted Proposals shall be in full compliance with the bidding requirements. Bid <br /> deposit shall be in an amount sufficient for the Proposal as resubmitted. <br /> After the scheduled time for opening Proposals, no Bidder will be permitted to withdraw <br /> his Proposal unless the award of contract is delayed for a period exceeding 45 <br /> calendar days. Proposals received after the scheduled closing for opening Proposals <br /> will be returned unopened to the Bidder. I <br /> 1-02.12 Public Opening of Proposals <br /> Supplement 1-02.12 by adding the following: <br /> 1-02.12(1) Postponement of Opening <br /> (******) <br /> The City reserves the right to postpone the date and time for receiving or opening of <br /> Bids, or both, at any time prior to the date and time established in the Notice to <br /> Bidders. Postponement notices shall be provided to Bidders in the form of addenda. <br /> 1-02.13 Irregular Proposals <br /> Revise item 1 of 1-02.13 to read as follows: <br /> 1. A Proposal will be considered irregular and will be rejected if: <br /> a. The Bidder is not prequalified when so required; <br /> b. The authorized proposal form furnished by the City is not used or is altered; <br /> c. The completed proposal form contains any unauthorized additions, deletions, <br /> alternate Bids, or conditions; Il <br /> d. The Bidder adds provisions reserving the right to reject or accept the Award, <br /> or enter into the Contract; <br /> e. A price per unit cannot be determined from the Bid Proposal; <br /> f. The Proposal form is not properly executed; <br /> g. The Bidder fails to submit or properly complete a Subcontractor list, if <br /> applicable, as required in 1-02.6; <br /> h. The Bidder fails to submit or properly complete a Disadvantaged, Minority or <br /> Women's Business Enterprise Certification, as required in 1-02.6; <br /> i. The Bid Proposal does not constitute a definite and unqualified offer to meet <br /> the material terms of the Bid invitation; or <br /> j. More than one proposal is submitted for the same project from a Bidder under I <br /> the same or different names. <br /> 1-02.14 Disqualification of Bidders <br /> Revise 1-02.14 to read as follows: <br /> A Bidder will be deemed not responsible if the Bidder does not meet the mandatory <br /> bidder responsibility criteria in RCW 39.04.350(1), as amended, and noted in 1- <br /> 02.1(1). <br /> Sewer Regulators R4 and Division 1 —GENERAL REQUIREMENTS May 2017 1 <br /> R39 Modifications <br /> WO No—UP3633 SP-50 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.