My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> Circular 570. The bonds must be signed by an officer of the Contractor empowered to <br /> sign binding instruments. The bonds must be accompanied by a fully executed and <br /> original power of attorney for the officer executing on behalf of the surety. The scope <br /> of the bonds or the form thereof prescribed in these Contract Documents shall in no <br /> way affect or alter the liabilities of the Contractor to the Owner as set forth in the <br /> Contract Documents. <br /> 1-03.5 Failure to Execute Contract <br /> Supplement 1-03.5 by adding the following: <br /> In addition to the items listed in the first paragraph of 1-03.5, failure to have or obtain a <br /> City of Everett business license prior to executing the Contract, unless immediately <br /> cured by Bidder after notice from the City, shall result in forfeiture of the proposal bond <br /> or deposit of this Bidder. <br /> 1-03.6 Return of Bid Deposit <br /> Supplement 1-03.6 by adding the following: <br /> Within 15 calendar days after the Bids are opened, the City will return the bid deposit <br /> accompanying the Bids that are not to be considered in making the Award. <br /> 1-03.7 Judicial Review <br /> Revise the first paragraph of 1-03.7 to read as follows: <br /> All protests by Bidders must be in accordance with Chapter 3.46 of the Everett <br /> Municipal Code, "Bid Protest Procedures." <br /> The exclusive venue of all lawsuits shall be in Snohomish County Superior Court. <br /> 1-04 SCOPE OF THE WORK <br /> 1-04.1 Intent of the Contract <br /> Supplement 1-04.1 by adding the following: <br /> 1-04.1(3) Specifications and Plans <br /> (******) <br /> I1-04.1(3)A Interpretation of Specifications and Plans <br /> The Specifications and Plans are intended to be explanatory and supportive of <br /> each other. Work specified on the Plans and not in the Specifications, or vice <br /> versa, shall be executed as if specified in both. In the event the Work to be done <br /> or matters relative thereto are not sufficiently detailed or explained in the Contract <br /> Documents, the Contractor shall immediately ask the City's Representative for <br /> further explanation and shall comply with such explanation. In the event of doubt <br /> or question arising respecting the true meaning of the Specifications or Plans, <br /> Contractor shall refer to the City's Representative for its decision. <br /> 1-04.1(3)B Division of Specifications and Plans <br /> Specifications and Plans are divided into groups for convenience. These divisions <br /> are not for the purpose of apportioning Work or responsibility for Work among <br /> Subcontractors, Suppliers and manufacturers. The Contractor is responsible for <br /> all Work shown or described, regardless of location(s) in the Contract Documents. <br /> 1-04.1(3)C Discrepancies in Specifications and Plans <br /> 1-04.1(3)C(1) Errors and Omissions <br /> If the Contractor becomes aware of any errors or omissions in the Contract <br /> Documents or in the City's field work, it shall immediately inform the City's <br /> Sewer Regulators R4 and Division 1 —GENERAL REQUIREMENTS May 2017 <br /> R39 Modifications <br /> WO No—UP3633 SP-53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.