Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> 8. Amendments to WSDOT Standard Specifications for Road, Bridge, and <br /> Municipal Construction, and <br /> 9. WSDOT/APWA Standard Specifications for Road, Bridge, and Municipal <br /> Construction, <br /> 10.WSDOT/APWA Standard Plans for Road, Bridge and Municipal Construction. <br /> In case of any ambiguity or dispute over interpreting the Contract, the Engineer's <br /> decision will be final as provided in 1-05.1 AUTHORITY OF THE ENGINEER. <br /> 1-04.4 Changes <br /> Delete 1-04.4 and substitute the following: <br /> 1-04.4 Changes <br /> 1-04.4(1) City's Right to Direct Changes to the Work <br /> (******) <br /> The City reserves the right to change the Work at any time. Such changes shall not <br /> invalidate the Contract nor release the Surety, and the Contractor agrees to perform <br /> the Work as changed. Among others, these changes and alterations may include: <br /> 1. Deleting or omitting any part of the Work, Equipment or material to be <br /> provided under this Contract, <br /> 2. Increasing or decreasing quantities, <br /> 3. Altering Specifications, designs, or both, <br /> 4. Altering the way the Work is to be done, <br /> 5. Adding new Work or Extra Work, <br /> 6. Altering facilities, Equipment, materials, services, or sites, provided by the <br /> City, and <br /> 7. Ordering the Contractor to accelerate or Delay the Work. <br /> If the Contractor and City do not agree upon scope of Work changed or adjustment to <br /> the Contract Sum and Contract Time, the City may, at its sole option, unilaterally direct <br /> the Contractor to implement City directed change by notice. The City shall not pay or <br /> ■ be responsible or liable for changes implemented by the Contractor without explicit <br /> notice from the City to proceed. <br /> 1-04.4(2) Extra Work <br /> (******) <br /> At its sole option, the City may (1) perform Extra Work itself, (2) employ others to do it, <br /> (3) direct the Contractor to perform the Extra Work at existing unit Bid price, (4) direct <br /> the Contractor to perform the Extra Work at a mutually agreed upon price, or (5) direct <br /> the Contractor to perform the Extra Work on a Force Account basis. <br /> 1-04.4(3) Change Orders <br /> (******) <br /> Changes to the Work may result in an increase or decrease in Contract Sum, as <br /> provided in 1-09.4 EQUITABLE ADJUSTMENT. Requests for an increase in Contract <br /> Time shall be made as provided in 1-08.3 PROGRESS SCHEDULE as applicable. <br /> Substantial changes in Contract Time, Contract Sum or Work will often be negotiated <br /> and agreed between the Contractor and City before the City directs the Contractor to <br /> proceed with the change. <br /> • <br /> Sewer Regulators R4 and Division 1 -GENERAL REQUIREMENTS May 2017 <br /> R39 Modifications <br /> WO No-UP3633 SP-55 <br />