My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> upon completion of the Contract Work; the field book shall be submitted to the <br /> Engineer and become property of the City. <br /> If the survey work provided by the Contractor does not meet the standards of the <br /> Engineer, then the Contractor shall, upon the Engineer's written request, remove the <br /> individual or individuals doing the survey work and the survey work will be completed <br /> by the Engineer at the Contractor's expense. Costs for completing the survey work <br /> required by the Engineer will be deducted from monies due or to become due the <br /> Contractor. <br /> The City may spot-check the Contractor's surveying. These spot-checks will not <br /> change the requirements for normal checking and testing as described elsewhere, and <br /> do not relieve the Contractor of the responsibility of producing a finished product that is <br /> in accordance with the Contract. <br /> In all disputes concerning accuracy of lines and elevations, the City shall be assumed <br /> correct and the Contractor shall correct the discrepancies before construction work <br /> may proceed. No additional compensation will be paid for this corrective Work. <br /> Payment: The lump sum contract price for "Surveying" shall be full pay for all costs <br /> involved in furnishing all labor, tools, survey instruments, materials, and other <br /> equipment necessary for the setting and maintaining of the alignment and grade as <br /> specified. <br /> 1-05.6 Inspection of Work and Materials <br /> Supplement 1-05.6 by adding the following: <br /> 1-05.6(1) Demonstration of Compliance with Contract Requirements <br /> (******) <br /> The burden of proving the constructed Work complies with the Contract Documents <br /> shall be on the Contractor at all times. The Contractor shall grant the City's <br /> Representative access to the Work and work site and to places where Work is being <br /> prepared, or where materials, Equipment, or machinery are being obtained for the <br /> Work. The Contractor shall provide information requested by the City's Representative <br /> in connection with inspection work. <br /> If the Contract Documents, laws, ordinances, or public regulatory authority requires <br /> parts of the Work to be specially inspected, tested, or approved, the Contractor shall <br /> 111 give the City's Representative be not less than two working days prior written Notice of <br /> the availability of the subject Work for examination. <br /> Inspection and quality control tests performed on the Contractor's work by the City's <br /> Representative shall not relieve the Contractor of its responsibility for errors or lack of <br /> quality therein and shall not be regarded as an assumption of risks or liability by the <br /> City's Representative for the Contractor's compliance with these Contract Documents. <br /> Contractor remains responsible and liable for all errors, defects or a lack of quality not <br /> discovered by inspection or observation. <br /> 1-05.6(2) Manufacturer's Directions <br /> (******) <br /> Manufactured articles, material and Equipment shall be transported, stored, applied, <br /> installed, connected, erected, adjusted, tested, operated and maintained as <br /> recommended by the manufacturer, unless otherwise specified in these Special <br /> Provisions. Provide manufacturer's installation instructions and procedures to the City <br /> prior to installation of the manufactured articles, material and Equipment. <br /> 1 Sewer Regulators R4 and Division 1 -GENERAL REQUIREMENTS May 2017 <br /> R39 Modifications <br /> IWO No-UP3633 SP-65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.