My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> Completion Date. The Contractor's request shall list the specific items of Work that <br /> remain to be completed in order to reach physical completion. The Engineer will <br /> schedule an inspection of the Work with the Contractor to determine the status of <br /> completion. The Engineer may also establish the Substantial Completion Date <br /> unilaterally. <br /> If, after this inspection, the Engineer concurs with the Contractor that the Work is <br /> substantially complete and ready for its intended use, the Engineer, by written notice to <br /> the Contractor, will set the Substantial Completion Date. If, after this inspection the <br /> Engineer does not consider the Work substantially complete and ready for its intended <br /> use, the Engineer will, by written notice, so notify the Contractor giving the reasons <br /> therefore. <br /> Upon receipt of written notice concurring in or denying substantial completion, 111 <br /> whichever is applicable, the Contractor shall pursue vigorously, diligently and without <br /> unauthorized interruption, the Work necessary to reach Substantial and Physical <br /> Completion. The Contractor shall provide the Engineer with a revised schedule <br /> indicating when the Contractor expects to reach substantial and physical completion of <br /> the Work. <br /> The above process shall be repeated until the Engineer establishes the Substantial <br /> Completion Date and the Contractor considers the Work physically complete and <br /> ready for final inspection. <br /> 1-05.11(2) Final Inspection and Physical Completion Date <br /> When the Contractor considers the Work physically complete and ready for final <br /> inspection, the Contractor, by written Notice, shall request the Engineer to schedule a <br /> final inspection. The Engineer will set a date for final inspection. The Engineer and the <br /> Contractor will then make a final inspection and the Engineer will notify the Contractor <br /> in writing of all particulars in which the final inspection reveals the Work incomplete or <br /> unacceptable. The Contractor shall immediately take such corrective measures as are <br /> necessary to remedy the listed deficiencies. Corrective work shall be pursued <br /> vigorously, diligently, and without interruption until physical completion of the listed <br /> deficiencies. This process will continue until the Engineer is satisfied the listed <br /> deficiencies have been corrected. <br /> If action to correct the listed deficiencies is not initiated within seven days after receipt <br /> of the written notice listing the deficiencies, the Engineer may, upon written notice to <br /> the Contractor, take whatever steps are necessary to correct those deficiencies <br /> pursuant to 1-05.7 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK. <br /> The Contractor will not be allowed an extension of Contract Time because of a Delay I <br /> in the performance of the Work attributable to the exercise of the Engineer's right <br /> under the authority of the Contract. <br /> Upon correction of all deficiencies, the Engineer will notify the Contractor and the City, I <br /> in writing, of the date upon which the Work was considered physically complete. That <br /> date shall constitute the Physical Completion Date of the Contract, but shall not imply <br /> acceptance of the Work or that all the obligations of the Contractor under the Contract <br /> have been fulfilled. <br /> 1-05.11(3) Operational Testing <br /> It is the intent of the City to have at the Physical Completion Date a complete and I <br /> operable system. Therefore when the Work involves the installation of machinery or <br /> other mechanical equipment; street lighting, electrical distribution or signal systems; <br /> Sewer Regulators R4 and Division 1 —GENERAL REQUIREMENTS May 2017 111 <br /> R39 Modifications <br /> WO No—UP3633 SP-68 I <br />