My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/14/2017
>
Contracts
>
Capital Contract
>
Faber Construction 8/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:05:25 AM
Creation date
8/18/2017 11:15:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/14/2017
Council Approval Date
7/27/2017
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modification
Public Works WO Number
UP3633
Tracking Number
0000808
Total Compensation
$1,098,104.63
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION 4/8/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> 1-05.16 Water and Power <br /> The Contractor shall make necessary arrangements, and shall bear the costs for power <br /> and water necessary for the performance of the Work, unless the Contract includes power <br /> and water as a pay item. <br /> Contractor shall pay all power and water costs until Substantial Completion, whether such <br /> power or water is provided by temporary or permanent facilities. City shall not be liable for <br /> any costs or Delays arising out of or caused by the availability or lack of availability of <br /> permanent power or utilities. <br /> 1-05.17 Oral Agreements <br /> ******) <br /> No oral agreement or conversation with any officer, agent, or employee of the City, either <br /> before or after execution of the Contract, shall affect or modify any of the terms or <br /> obligations contained in any of the documents comprising the Contract. Such oral <br /> agreement or conversation shall be considered as unofficial information and in no way <br /> binding upon the City, unless subsequently put in writing and signed by the City. <br /> 1 1-05.18 Contractor <br /> (******) <br /> 1-05.18(1) Contractor's Representative <br /> The Contractor shall notify the Owner in writing of the name of the person who will act <br /> as the Contractor's representative, will have the authority to act in matter relating to <br /> this Contract, and will be delegated with authority to act as the Contractor's emergency <br /> contact. This person shall have authority to carry out the provisions of the Contract <br /> and to supply materials, Equipment, tools and labor without delay for the performance <br /> of the Work. <br /> Contractor shall employ and keep on site on a full time basis personnel experienced in <br /> the management of construction of projects of this size and type. These shall include, <br /> but not be limited to, a project manager and superintendent. Neither the Contractor's <br /> project manager nor the superintendent shall have supervisory responsibility for other <br /> projects for the Contractor while assigned to this Project. Contractor shall employ and <br /> assign such additional, full time office, support and engineering personnel to support <br /> the project manager and superintendent and allow timely completion of the Project. <br /> The project manager and superintendent shall be approved by the City, and such <br /> approval shall not be unreasonably withheld. Contractor shall submit personnel <br /> qualifications within seven (7) days of Contractor's execution of the Contract. Basis for <br /> disapproval include, but are not limited to, lack of sufficient experience managing the <br /> construction of similar type or size projects or relationships on other projects <br /> unsatisfactory to the City or, if the Project is subject to supplemental bidder <br /> responsibility criteria and such criteria contain personnel qualifications, the personnel <br /> differ from those named by Bidder in its pre-Award supplemental bidder responsibility <br /> criteria submittals. City may require removal and replacement of Contractor's <br /> supervisory staff who are disruptive or who appear to lack sufficient competence to <br /> complete the Project successfully. <br /> I1-05.18(2) Construction Procedures <br /> The Contractor shall supervise and direct the Work and determine the means, <br /> methods, techniques, sequences and procedures of construction, except in those <br /> instances where the City, to define the quality of an item of Work, specifies in the <br /> Sewer Regulators R4 and Division 1 —GENERAL REQUIREMENTS May 2017 <br /> R39 Modifications <br /> WO No—UP3633 SP-71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.