My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8123 FLORIDA DR 2018-07-11
>
Address Records
>
FLORIDA DR
>
8123
>
8123 FLORIDA DR 2018-07-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2018 12:51:47 PM
Creation date
8/21/2017 11:24:42 AM
Metadata
Fields
Template:
Address Document
Street Name
FLORIDA DR
Street Number
8123
Notes
Original house moved from 8119 to 8123 Florida Dr
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Universal Helper insulation � <br /> Address or Lot Number Ci`e1(�e <br /> City and Zip <br /> Conditioned Floor Area <br /> (ft2)c -- <br /> Age of House: <br /> Source (circle one) PlansEstimated] Measured <br /> Results shall be reported as Air Changes per Hour at 50 Pascal's(ACH50)and shall be calculated <br /> as Follows: <br /> Where: <br /> CFM50= Blower door fan flow <br /> at 50 Pascal pressure difference <br /> Volume= Conditioned Floor E <br /> Area of the housing unit x <br /> ceiling height Q Vt <br /> Blower Door Test Result: ACHso <br /> CFM@50Pa <br /> Ring(Circle one if Applicable); 0pe A 3 C <br /> Blower Door Fan Location: <br /> a-.a I?oe!5Ile <br /> Weather Conditions: <br /> I certify that these blower door results are accurate and determined using standard industry protocol. <br /> Company Name: lf�f S ca U409C.9 Technician: ae lit" <br /> 2012 Washington State Energy Code references: <br /> R402.4.1.2 Testing.The building or dwelling unit shall be tested and verified as having an air leakage rare of not 5 air changes per hour in climate Zones 1 and 2::::d 35 air <br /> changes per hour in climates zones 3 through 8.Testing shall be conducted wic":i hlowrr door at a pressure of 1.2 inches w.g(SOPascals).Where required b-, official, <br /> testing shall be conducted by approved third party.A written report of the result of the test shah be signed by the party conducting the test and provide to to -)fficial. <br /> Testing shall be performed at anytime after creation ofall penetrations for the building therm:;i envc;o-)e.Once visual inspection has confirmed the presence- ,::sket fsee <br /> section 502.4),operable windows and doors manufactured by small business shalt oermatea cc.;e saz.iel offal me Brame prim-the test. <br />
The URL can be used to link to this page
Your browser does not support the video tag.