Laserfiche WebLink
INSPECTION REPORT 3,�3 <br /> Date: Permit: <br /> Contractor: <br /> Owner. <br /> Site Address: <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab ❑ Groundwork/Slab <br /> ❑Groundwork Q Irl- [:1 Rough In El Rough In <br /> ❑Slab/Conduit �Footing <br /> ❑ oundation/--k/ ElCeiling Grid ElCeiling Grid <br /> Rough In tructural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> of <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> K FOR T.C.O. ❑ CORRECTION REQUESTED F]❑ OK FOR C.O. El VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Ke j 10 AVIkA A Y-) V J <br /> L <br /> 14 >h flAf JA <br /> 4 At <br /> La <br /> i <br /> 4� <br /> — - --- <br /> Inspector: Date:_ l <br /> EIR(4/09) aLSfcynTRE 1 Qaoe.n9un <br />