Laserfiche WebLink
12/11/2015 Page 1 <br /> 7:%9:41AA City of Everett <br /> 0 0 <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. PW0601-006 Site Address 4841 GLENWOOD AVE <br /> Applied 1/11/2006 Applicant Lot <br /> Approved 1/31/2006 Owner POPOV PETER Block <br /> Issued 2/6/2006 Contractor CHERBA MARBLE GRANITE Tract <br /> I'arent Permit No. C0601-007 Description NEW HOUSE SITE WORK SEE ATTACHED PHOTOS <br /> Notes <br /> Scheduled Completed Tvoe Inspector Result Remarks Inspector's Comments <br /> 11/22/2006 11/22/2006 MiscPWInsp RDA Violation No dirt excavation, Erosion control and building construciton <br /> see notes only. <br /> Keep pump discharge for surface water on <br /> site at all times. <br /> All soil to be covered with straw or plastic. <br /> Need additional rock,constructin entrance. <br /> 12/28/2006 12/28/2006 MiscPWInsp RDA <none> See notes Clean catch basins at bottom of driveway. <br /> Install catch basin sediment trpas. <br /> Sand bag water run-off drains. <br /> Straw mulch all exposed soil <br /> Install construction entrance to bottom of <br /> hill,2"clean rock for entire length of <br /> driveway. <br /> 1/3/2007 1/3/2007 MiscPWInsp RDA Other Workmanship Engineered/geotechnical report on ecology <br /> deficiency,see notes block wall. <br /> Engineered erosion control plan. <br /> Celan existing storm drain outfall in <br /> Glenwood,one week for completion, <br /> non-compliance result in Stop Work. <br /> 2/2/2007 2/2/2007 MiscPWInsp RDA Other Workmanship Cover ground with straw in front of house. <br /> deficiency,see notes Connect temporary piping on north side of <br /> house to catch basin,use screws. <br /> Fix piping in driveway. <br /> 6/13/2007 MiscPWInsp RDA Corr 12egd 24-hour power to 1)Must have power to temporary storm <br /> temp pump,see pump at all times. <br /> notes 2)Must submit stamped engineering for <br /> ecology block wall over height(8'). This <br /> has been requested before,this is a one <br /> week notice for a STOP WORK ORDER, <br /> no work of any kind. <br /> 7/24/2007 7/24/2007 Other RDA Corr Reqd Wall drain,see notes Wall drain behind driveway retaining wall <br /> will have to be uncovered to verify piping. <br /> 7/26/2007 7/26/2007 Final PW RDA PartialApproval OK temp occupancy, Public Works OK for temporary occupancy. <br /> see notes Final approval is subject to completing <br /> driveway,storm drainage,ground <br /> cover/landscaping,Geotech approval of <br /> ecology block wall. <br /> 7/26/2007 7/26/2007 MiscPWInsp RDA Ecology block wall, Certification of Ecology Block Wall: <br /> see notes City of Everett requires special inspection <br /> a j1)C and written approval.of installation of <br /> l/L l,S c�v V2. 1 ecology block wall(5 blocks high). <br /> W Must be turned in to City of Everett prior to <br /> Final Certification by Geotech or structural <br /> engineer. <br /> 10/2/2007 10/2/2007 Other RDA Corr Reqd Erosion control,see Cover all exposed soil with straw or mulch. <br /> notes Clean storm drain ipe plugged at entrance <br /> to driveway. <br /> 8/19/2008 8/19/2008 Other RDA Corr Reqd See notes Non Compliance with Hearing Examiner to <br /> 7 Install/repair block retaining wall per <br /> approved plans <br /> 6:u ry!'C'/( til REPAIR SCHEDULE IS REQUIRED <br /> INSP12 <br /> SYSTEMS <br />