Laserfiche WebLink
12/11/20W I <br /> ;5 Ci of Everett <br /> t0:22:24AM 0 tY <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C0601-007 Site Address 4841 GLENWOOD AVE <br /> Applied 1/11/2006 Applicant Lot <br /> Approved 2/3/2006 Owner POPOV PETER Block <br /> Issued 2/6/2006 Contractor CHERBA MARBLE GRANITE Tract <br /> Parent Permit No. Description NEW HOUSE <br /> Notes * DO NOT DISTURB AREA EAST OF THE 290'CONTOUR LINE <br /> Scheduled ComDleted Tvoe Inspector Result Remarks InSDector's Comments <br /> 4/3/2006 4/3/2006 Footing TMB Approval <br /> 4/10/2006 4/10/2006 Bldg Other TMB Approval UFER ground <br /> 4/10/2006 4/10/2006 Foundation TMB Approval <br /> 5/5/2006 5/5/2006 Foundation TMB Approval Structural slab <br /> 5/12/2006 5/12/2006 Consultation TMB Corr Reqd Retaining wall,see Consultation. <br /> notes Obtain engineering for ecology block <br /> retaining wall. <br /> 6/9/2006 -- 6/9/2006 Other TMB Approval Underfloorjoint <br /> 9/22/2006 9/22/2006 P1bgRoughIn SDP Approval <br /> 11/16/2006 11/16/2006 Framing TMB PtAppr-CorrReq See notes 1.Obtain separate mechanical inspection <br /> approval <br /> 2.Complete sill anchors <br /> 3.Nail off beam hangers <br /> 4.Ventilate attic at entry room <br /> 12/1/2006 12/1/2006 MechRoughIn SDP Corr Reqd See notes 1)Maintain V clearance bewteen B-vent <br /> and combustibles. <br /> 2)Complete draft stop in attic for B-vent. <br /> 3)Furnace in attic shall have solid flooring <br /> from access to unit. Access large enough to <br /> remove biggest piece and emergency pan <br /> drain must run separately to obvious <br /> location. <br /> 4)Provide combustion air to furnace room <br /> in garage at Final. <br /> 12/1/2006 12/1/2006 Framing TMB Approval <br /> 12/6/2006 12/6/2006 GasPiping SDP Approval Gas pipe OK for <br /> service <br /> 12/6/2006 12/6/2006 MechRoughIn SDP Approval See notes Approval as noted: <br /> Where do condensate and drain pan <br /> terminate?(attic) <br /> I can see a PVC line running to the outside <br /> soffit,but do not see where it terminates to <br /> the outside. Will need to verify this at <br /> Final. Will also need a ladder to attic at <br /> Final. <br /> 12/11/2006 12/11/2006 InsulBldg TMB Approval <br /> 1/3/2007 1/3/2007 Site Visit TMB <none> With PW inspector, Supporting Public Works inspector Randy <br /> see notes Allen RE:site concerns. <br /> 6/27/2007 6/27/2007 Final Bldg DWF Corr Reqd See notes Complete guard rail,rear deck. <br /> Complete landscape,sidewalk to front <br /> entry. <br /> Lag bolts missing frmo deck ledger plate. <br /> Plumbing,Electrical,Mechanical,Fire <br /> Dept,Public Works need to be finaled <br /> before bldg. <br /> INSP12 <br /> SYSTEMS <br />