My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003 78TH PL SE 2017-08-22
>
Address Records
>
78TH PL SE
>
2003
>
2003 78TH PL SE 2017-08-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2017 3:48:13 PM
Creation date
8/22/2017 3:48:03 PM
Metadata
Fields
Template:
Address Document
Street Name
78TH PL SE
Street Number
2003
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> INSPECTION REPORT <br /> Date:_ gj ' �D L Permit: — W <br /> Contractor:_ ��pl(\.q <br /> Owner: �� Cl•��/' "e� <br /> Site Address: 2LQ- _�� t �o <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑ Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to nsuI to El OK to insulate <br /> [:1 Service f]Frami r [_1R oft Units El Water Service <br /> F-1Grounding , WS)4 )k-&* 9'h n)4,Wal ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> PPROVAL ❑ PARTIALAPPROVAL FINAL APPROVAL THIS PERMIT <br /> K FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> OK FOR C.O. El VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: Date:A-0 r J <br /> EIR(4/Og) <br />
The URL can be used to link to this page
Your browser does not support the video tag.