My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/04/19 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/04/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2017 10:53:00 AM
Creation date
8/23/2017 10:51:03 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/19/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 3:Chapter 6 Capital Facilities and Utilities Element; II.Capital Facilities Policies; Capital Facilities Summaries <br /> 2. Libraries ` ` T <br /> Library services in Everett are governed by a five , v-- ' <br /> member Board of Trustees who are appointed by ` i` ' <br /> the Mayor and confirmed by the City Council. °' ` <br /> Operational funding comes from general City of ' 'r ,.ti <br /> Everett revenues. Major capital facility funding • NI III <br /> has come from bond issues,with minor repairs 4 - <br /> and improvements coming from both generalM..� � �6 <br /> revenues and CIP funding. The City of Everett _ �:' `�. <br /> provides Library services through a Main Library 1p� ' <br /> A <br /> and an Evergreen Branch. •.* �' , ; . <br /> Table 5 below summarizes historical patterns that may be <br /> useful in judging future needs: <br /> Table 5: Historical Library Facilities Projects <br /> Year. Pop. f Building Source Funds 1 Size Notes <br /> 1905 ao,000 New Building—Carnegie gift 4,50o sq ft Everett's first real library—Oakes®Wall <br /> 1934 30,000 New Bldg.- Howarth 8,000 sq ft Original building at Hoyt&Everett Ave <br /> Bequest site <br /> 1960 45,000 Remodel 12,000 sq An unfortunate era for architecture <br /> ft <br /> 1989 64,17o New Evergreen Branch— 8,500 sq ft Branch currently at capacity <br /> bond <br /> 2016- 105,o8o Evergreen Branch(South Funding allocated for project design. <br /> 22 Everett Branch)Expansion- Design and construction estimated cost of <br /> OP4 $5,000,000. _ <br /> 1991 172,493 Main Lib Remodel-bond 54,985 Future expansion part of Everett Center <br /> plan. <br /> The construction of Library Place to the south of the envisioned future expansion and development of a <br /> Main Library leaves no easy opportunity to expand this museum on the Elk's property to the south. A 1992 <br /> facility. A feasibility study conducted in 2013 decision to abandon the Everett Center project <br /> demonstrated that it would be possible to expand the followed by the 2009 construction of Library Place <br /> Evergreen Branch(South Everett Branch)at its current leaves no room to expand the library to the south. See <br /> location by just over 5,200 square feet and create an Figure 6. <br /> additional 36 parking spaces. There is currently no <br /> funding for such a project. An expansion is needed (b) Forecast for future needs. While population <br /> given that when the branch was built,Everett's growth,changes in how people use libraries,and <br /> population was just over 64,000 people. Now changes in technology,especially those related to the <br /> approximately that many people live south of Madison Internet and computers,affect both libraries,the <br /> Street.The City of Everett is proceeding with this Evergreen Branch is particularly vulnerable to the <br /> expansion project with anticipated completion by 2018. population growth in south Everett because of its size. <br /> The planned expansion will add over5,000 square feet There is some room for expansion on city property to <br /> to the existing building to provide new areas for the south of the Evergreen Branch. Whether this will <br /> meetings,studying,computers,and children's provide enough building and parking space by the time <br /> programs. the project is funded should be considered. Adequate <br /> parking will be important to the success of an expanded <br /> (a) Inventory and location. The Evergreen Branch was branch,given the lack of other parking options in the <br /> dedicated in 1989, and is located on Evergreen Way in vicinity of the branch. <br /> the southern part of the City. It has been at capacity for <br /> the past ten years. The Main Library underwent its third Although the Main Library is less affected than the <br /> major renovation and expansion in 1991. This plan Evergreen Branch by the growing population of south <br /> 1 <br /> 112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.