My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/04/19 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/04/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2017 10:53:00 AM
Creation date
8/23/2017 10:51:03 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/19/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parks Department Swim Center I 0 Page 2 of 3 <br /> Electrical Systems Upgrades and Arc Flash Breaker Coordination Study <br /> Engineering Fee Proposal <br /> TASK 2—Lighting Upgrade in Natatorium • <br /> • <br /> • Replace lighting fixtures in natatorium with new LED fixtures. <br /> • Provide new 277V circuits to the new LED lighting fixtures in natatorium. <br /> • Provide new lighting control to the lighting system in natatorium. <br /> • Provide lighting calculation drawing in natatorium performed by the lighting <br /> vendor. <br /> TASK 3—Arc Flash Breaker Coordination Analysis <br /> • The Short Circuit Current, Protective Coordination, and Arc Flash Hazard <br /> analysis studies will be produced utilizing SKM software. Existing breakers will <br /> be coordinated to meet the maximum PPE Category Level 2 requirements (or as <br /> close as possible).A report including the studies will be provided. <br /> • Arc Flash Hazard labels will be provided for installation on equipment as <br /> required. <br /> TASK 4—Swim Center BAS Controls Upgrade <br /> • Integrate into Task #1 drawings and specifications an upgrade to the BAS <br /> • controls utilizing the equipment and information provided in the Swim Center <br /> Electrical Scope of Work documents provided by the City. <br /> DELIVERABLES: <br /> TASK 1 — Electrical Systems Upgrade <br /> • 30% Schematic Design Documents including drawings, outline specifications and <br /> ROM cost estimate. <br /> • 60% Schematic Design Documents including drawings and specifications, <br /> product cut sheets and ROM cost estimate. <br /> • 100% Construction Documents ready for bidding and permit. <br /> TASK 2—Lighting Upgrade in Natatorium <br /> • 30% Schematic Design Documents including drawings, outline specifications and <br /> ROM cost estimate. <br /> • 60% Schematic Design Documents including drawings and specifications, <br /> product cut sheets and ROM cost estimate. <br /> • 100% Construction Documents ready for bidding and permit. <br /> TASK 3—Arc Flash Breaker Coordination Analysis <br /> • One (1) hardcopy of the report will be provided to 'the Local Operations and <br /> Maintenance team for posting in the electrical Room. One (1) hardcopy of the <br /> report will be provided to the projects and planning department. This copy will <br /> also contain a CD which will contain the entire report in PDF format as well as <br /> the SKM project files on it. <br /> 165 <br /> __ - .... .. ,,,,,, r r.__.SI_ urn nn.,r _�nir err�nnn 1 a.rr��.•+n rlir`Farar r 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.